bc; to DAC:ADM:
CENTRAL FILES UNITED STATES POR:HQ
/pa "%,#'o NUCLEAR REGULATGRY COMMISS ON LPDR O'
REGloN IV 7 (
o 611 RY AN PLAZ A DRIVE SUITE 1000 *
- II C..
3,j'
..j ARLINGTON, TEXAS 76012 NSIC o
November 16, 1979 Docket No.
50-298 Nebraska Public Power District ATIN:
J. M. Pilant, Director Licensing & Quality Assurance Post Office Box 499 Columbus, Nebraska 68601 Gentle =en:
The enclosed IE Information Notice No. 79-28 provides information on the overloading of structural elements due to pipe support loads.
Sincerely, Karl V. S rit Director
Enclosures:
1.
IE Information Notice No. 79-28 2.
Listing of Recently Issued IE Information Notices cc:
L. C. Lessor, Superintendent Cooper Nuclear Station Post Office Box 98 1727 0l2 Brownville, Nebraska 68321 a
m 8001100 ) 2C
SSINS No.:
6870 Accession No.: 7910250 Mh UNITED STATES NUCLEAR REGULATORY COMMISSION hu 0FFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 November 16, 1979 IE Information Notice No. 79-28 OVERLOADING OF STRUCTURAL ELEMENTS DUE TO PIPE SUPPORT LOADS Description of Circun. stances:
Recently, the NRC was informed that, in the course of the inspections pursuant to IE Bulletin No. 79-02 and 79-14 by the Portland General Electric Co. (PGE) at the Trojan Nuclear Plant, some walls were found which did not have adeem te structural strength to sustain the required support reactions.
Bechtel orporation was the Architect Engineer for the plant. These structural inadequacies were reported to be attributable to two deficiencies:
1)
Apparent lack of a final check of certain pipe support locations and reactions to ensure that the supporting structural elements possessed adequate structural integrity to sustain the required loads.
2)
Inadequate design criteria for the reactions from supports anchored into the face of concrete block walls; e.g., relying on the combined strength of double concrete block walls without positive connection between the two walls by means other than the bond provided by a layer of grout between them.
The NRC is currently pursuing these issues in detail for the Trojan Nuclear Plant to determine the extent of these deficiencies and the generic implications for other Bechtel facilities.
This Information Notice is provided as an early notificatica of a possible signif-icant matter.
It is expected that recipients will review the information for possible applicability to their facilities and the actions being performed under IE Bulletin No. 79-02.
Specific action is being requested relating to the adequacy of attachments to concrete block walls under IE Bulletin No. 79-02, Revision 2, item 5.c.
No specific actions are requested in response to this Information Notice.
If NRC evaluations so indicate, further licensee actions may be requested or required.
If you have any questions regarding this matter, please contact the Director of the appropriate NRC Regional Office.
No written response to this IE Information Notice is required.
1727 013
IE Information Notice No. 79-28 November 16, 1979 LISTING OF IE INFORMATION NOTICES ISSUED IN 1979 Information Subject Date Issued To Notice No.
Issued 79-20 NRC Enforcement Policy 8/14/79 All Holders of Reactor NRC Licensed Individuals Operating Licenses (0Ls) and Construction Permits (cps), Research Reactors, Test Reactors Licensees with Licensed Operators 79-21 Transportation and
"/7/79 All power and research Co=merical Burial reactors with Operating of Radioactive Material License (OL) 79-22 Qualification of Control 9/14/79 All power reactor Systems facilities with an Operating Licenses (OL) and Construction Permits (CP) 79-23 Emergency Diesel Generator 9/26/79 All power reactor Lube Oil Coolers facilities with an Operating License (OL) or Construction Permit (CP) 79-24 Overpressurization of 9/28/79 All power reactor Containment of a PWR Plant facilities with a After a Main Stream Line Construction Permit (CP)
Break 79-25 Reactor Trips at Turkey 10/1/79 All power reactor Poinc Unit 3 and 4 facilities with an Operating License (OL) or a Construction Pernit (CP) 79-26 Breach of Containment 11/5/79 All power reactor Integrity holding Operating License (OL) and Construction Permits (cps)79-12A Attempted Damage to 11/19/79 All Fuel Facilities, Fuel Assemblies research reactors, and power reactors with an Operating License (OL) or Construction Permit (CP)
Enclosure 1727 014
.