ML19290A246
| ML19290A246 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 08/30/1979 |
| From: | Stello V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | Mattson R NRC - TMI-2 LESSONS LEARNED TASK FORCE |
| Shared Package | |
| ML19290A225 | List: |
| References | |
| NUDOCS 7910240240 | |
| Download: ML19290A246 (1) | |
Text
.
f[
o, UNITED STATES a'
NUCLEAR REGULATORY COMMISSION s.,
o
..E WASHINGTON, D. C. 20556 ti,bf./
August 30, 1979 NOTE T0:
Roger J. Mattson, Director Lessons Learned Tash Force
SUBJECT:
HYDROGEN BUBBLE Reading over the draft of the chmnology and thinking more about it, caused me to recall two additional conversations regarding the Hydrogen Bubble:
1.
Sometime Saturday, I had a call from someone in the White House inquiring about the AP story that had been released.
I indicated that I did nct know the facts regarding that issue and since there was a reference to statements made by Frank Ingram, I suggested the story was most likely released from Bethesda and referred the caller to the Operations Center in Bethesda.
I cannot fix the time, but believe it was probately sate afternoon or early evening, Saturday.
2.
Shortly after the telephone call referred to above, I recall speaking to Mr. Case in Bethesda, trying to find out the basis for the concern over the Hydrogen Bubble. This phone conversa-tior provided me with the first insights to the concerns held by personnel in Bethesda.
I believe I indicated that I did not share the same concem at that time.
Victor Stello, Jr.
I Director Office of Inspection and Enforcement 2226 W4 e40 7910 2 4 0 M
-