ML19289G328
| ML19289G328 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 06/20/1979 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19289G329 | List: |
| References | |
| NUDOCS 7908280145 | |
| Download: ML19289G328 (2) | |
See also: IR 05000327/1979031
Text
t.
,
>1
,l[
'
'
h
.0 Mc
'o
UNIIED STATES
!" M Tg
NUCLEAR REGULATORY COMMISSION
g
3
RE 310N 11
~,,i., . - [r
-
g[h
i5 '
101 MARIETT A s)., N.W., SUI (E 3100
._o
%/* d
AT L. ANT A, GEORGI A 30303
JUN 2 0 D79
v
In Reply Refer To:
s
'
JII.TJD
'50-327/79-31
,'
_
'
Tennessee Valley' Authority
.
ATTN: Ii. OTParris
-
Maneger of Power
500A Chestnut Street To er II
Chattanooga, TN 37401 ',
s
Gentlemen:
This refers to t e inspection conducted by T.' J. Donat of this office on May 31,
19:9, a6d June 1,1979, of activi'sies authorized by NRC Constructica Permit No.
CFPR-72- for the Sequoyah Unit 1 facility, and to the discussion of our findings
held with W. E. Andrevs at the cer:clusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinttionr of procedures and repiesentative records, interviews with
personnel, and observations by the inspector.
Within the scope af this inspection, no iters of noncompli:nre were disclosed.
'
In accordance with Sectip. 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulatione, a copy of this letter and the enclosed inspection
report will be placed in tie NRC's Public Document Room. If this report contains
any information that yot, (or your contractor) believe to be proprietary, it is
necessary that you make ~a written application within 20 days to this office to
a
withhold such information from public disclosure. Any such application must
,
include a full statement of the rea hns an the basis of which it is claimed that
the information is proprietary, and s'aould be prepared so that proprietary
information identified in the application is contained in a separate part of the
'
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Docu. neat Room.
Should you have any questions concerning this letter, we will be glad to discuss
ther with you.
.<
Sincerely,
,
.
R[ichard
.C
.
cwis, Acting Chief
"
Reactor Operations and Nuclear
,
Support Branch
Enclosure:
3
140
See Page 2
-
4
,
79082801 W
,
.
$
Tennessee Valley Authority
-2-
JUN 2 01979
Enclosure:
Inspection Report No. 50-327/79-31
cc w/ enc 1:
J. E. Gilleland
Assistant Manager of ;<..er
500C Chestnut Street Tower II
Chattanooga, TN 37401
G. G. Stack, Project Manager
P. O. Box 2000
Daisy, TN 37319
J. M. Ballentine
~ Plant Superintendent
P. O. Box 2000
Daisy, TN 37319
J. F. Cox
400 Commerce Street
W10C131 C
Knoxville, TN 37902
D. L. Lambert, Project Engineer
400 Chestnut Street Tcwer II
Chattanooga, TN 37401
,
204?>
14I
.
.
I
1
1