Forwards Branch Request for Addl Info Re Second Round Questions
ML19289G317
Person / Time
Site: Crane, Midland  Constellation icon.png
Issue date: 09/28/1978
From: Ross D
Office of Nuclear Reactor Regulation
To: Vassallo D
Office of Nuclear Reactor Regulation
Shared Package
ML19289G307 List:
References
790928, NUDOCS 7908220468
Download: ML19289G317 (1)


Text

.

h f *se

/

  1. o UNITED ST ATES 8'

NUCLEAR REGULATORY COMM!sslON t, -

y WASMNGTON. O. C. 20555

/

SEP 2 81978 Docket Nos. 50-329/330 MEMORANDUM FOR:

D. B. Yassallo, Assistant Director for LWR's, DPM FROM:

D. F. Ross, Jr., Assistant Director for Reactor Safety, DSS

SUBJECT:

SICOND ROUND QUESTIONS - Mint ann et ANT UNITS 1 AND 2 Tiant Name:

Midland Units 1 and 2 Docket Numbers:

50-320 A co "O Milestene Number:

12-21 Licensing Stage:

OL Responsible Branch LWR-4 and Project Manager:

D. Hood Systems Safety Branch Involved: Reactor Systems Branch Description of Review:

Round Two Questions Requested Completion Date:

August 4, 1978 Review Status:

Incomplete The Reactor Systems Branch has reviewed the applicant's FSAR through Ameadment 10. Althcugh EG&G conducted the Round One review, RSB has conducted a " backup" Round One review of the FSAR, in addition to a review of tne Round One ~questien responses. The applicant has not yet responded to the Rcund One questions on cold shutdown reouirements and pipe break cor. sequences (211.35 and 211.83). They state that these responses are due in Septemaer. We will review these responses and forward positions as soon as ;cssible. Sucn late submittals create the usual conflicts with other schedulec reviews, in this case, Erie. Based on the pricrity list cistributed by DPM, we are assuming Midland takes precedence. Additional cuestions/ positions may result from our secondary review responsibility to branches that have not yet completed their review. Acprcximately 30 percent cf tne enclosed questions required interaction with other branches. Also, we have not yet reviewed the final Technical Specifications but will do so when available. Our Second Rcund questions are enclosed.

N M.%

0. F. xoss,, Jr., Assistant Director for Reactor Safety Division of Systems Safety

Enclosure:

Round Two Questions cc:

S. Hanauer H. Daniels G. Ma:etis R. Mattscn D. Ross S. Newberry C:ntact: Scott "ewberry, NRR S. Varga T. Nevak 49-27341 D. Hecd S. Israel