Text
I
UNITED STATES
.
gy'
'/ g
NUCLEAR REGULATORY COMM!sslON
MI
O
REGION I
<
I* 1
f
$31 PARK AVENUE
g g ,{., ,/
.
,
xiuo or enussia, ecunsvevania is os
,..+
MAR 30 S79
Docket Nos. 50-317
50-318
Baltimore Gas and Electric Company
'
ATTN:
Mr. V. R. Evans
Vice President, General Services
P. O. Box 1475
Baltimore, Maryland
21203
Gentlemen:
Subject:
Combined Inspection 50-317/79-03 and 50-318/79- 03
This refers to the inspection conducted by Mr. M. Rogers of this office
on February 6-8, 1979, at Calvert Cliffs Nuclear Power Station of
activities authorized by NRC License Nos. DPR-53 and DPR-69 and to the
discussions of our findings held by Mr. Rogers with Mr. L. Russell and
other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter.
Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
.
Our inspector also verified the steps you have taken to correct the
items of noncompliance brought to your attention in a letter dated-
January 4,1979.
We have no further questions regarding the steps you
took to correct Items 1, 2, 3, 4 and 6.
The corrective actions initisted
to avoid a recurrence of Item number 5 is apparently inadequate in that
the condition that created the noncompliance was found to exist during
this inspection.
Based on the results of this inspection, it appears that one of your
activities was not conducted in full compliance with NRC requirements,
as set forth in the Notice of Violation, enclosed herewith as Appendix
A.
This item of noncompliance has been categorized into the levels as
described in our correspondence to you dated December 31, 1974.
This
notice is sent to you pursuant to the provisions of Section 2.201 of the
NRC's " Rules of Practice," Part 2, Title.10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within twenty (20)
days of your receipt of this notice, a written statement or explanation
2229 300
79061597,/%
.I
.
Baltimore Gas and Electric
2
Company
IMR 3 0 579
in reply including:
(1) corrective steps which have been taken by you
and the results achieved; (2) corrective steps which will be taken to
avoid further items of noncompliance; and (3) the date when full compliance
will be achieved.
Item number 1 shown in the Notice of Violation enclosed with this letter,
is a recurrent or uncorrected item and corresponds to the noncompliance
Item number 5 brought to your attention in our letter dated January 4,
1979.
In your response please give this matter your particular attention.
In accordance with Section 2.790(d) of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, documentation of findings
of your control and accounting procedures for safeguarding special
nuclear materials and your facility security procedures are exempt from
disclosure; therefore, the enclosures to this letter, and your response
to this letter will not be placed in the Public Document Room and will
receive limited distribution.
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely,
[
,'
Walter G. Martin, Chief
Safeguards Branch
Enclosures:
1. Appendix A, Notice of Violation (Contains 2.790 Info)
2. Office of Inspection and Enforcement Combined Inspection
Report Number 50-317/79-03; 50-318/79- 03 (Contains 2.790 Info)
cc:
A. E. Lundvall, Jr., Vice President (w cy of encis)
L. B. Russell, Chief Engineer (w cy of encis)
C. Steinhagen, General Supervisor, Security Services (w cy of encis)
R. M. Douglass, Manager, Quality Assurance (w report cover sheet only)
W. Gibson, General Supervisor, Operations QA (w report cover sheet only)
R. C. L. Olson, Senior Engineer (w report cover sheet only)
K. H. Sebra, Principal Engineer (w report cover sheet only)
2229
301