ML19289F541

From kanterella
Jump to navigation Jump to search
Forwards LERs 79-066/03L-0 & 79-074/03L-0
Date released: 10/30/2019 Download: ML19289F541


LER 79-074/03L-0 on 790516:pressurizer Level Indicator L-1460 Failed During Performance of 1-PT-31.7.2.Cause Unknown.Wires Reconnected & Surveillance Undertaken
ML19289F544
Person / Time
Site: North Anna Dominion icon.png
Issue date: 06/04/1979
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19289F544 (2)
LER 79-066/03L-0 on 790506:narrow Range Level Transmitter LT-496 in L Steam Generator Read Erratically.Channel Inoperable.Probable Cause Was Drain Lines Off Both High & Low Pressure Sides of Transmitter.Lines Capped
ML19289F543
Person / Time
Site: North Anna Dominion icon.png
Issue date: 06/04/1979
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19289F543 (2)
Forwards LERs 79-066/03L-0 & 79-074/03L-0
ML19289F540
Person / Time
Site: North Anna Dominion icon.png
Issue date: 06/05/1979
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19289F540 (1)