ML19289E968

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-369/79-17 on 790226-28.No Noncompliance Noted
ML19289E968
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 03/21/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19289E967 List:
References
NUDOCS 7905290707
Download: ML19289E968 (2)


See also: IR 05000369/1979017

Text

.

.

%

~

.

UNITED STATES

  1. p nar00 #o,

NUCLEAR REGULATORY COMMISSION

9

,

,

[

}

REGloN il

o

{

$

101 MARIETTA STREET,N.W.

8

ATLANTA, GEORGIA 3o303

g"

/

          • ,

MAR 211979

In Reply Refer To:

RII:WTC

50-369/79-17

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 33189

Charlotte, N C 28242

Gentlemen:

This refers to the inspection conducted by Mr. W. T. Cottle of this office on

February 26-28, 1978, of activities authorized by NRC Construction Permit No.

CPPR-83 for the McGuire Nuclear Station, Unit I facility, and to the discussion

of our findings held with Mr. M. D. McIntosh at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have tIken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed

report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within

20 days to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the

basis of which it is claimed that the information is proprietary, and should

be prepared so that proprietary information identified in the application is

contained in a separate part of the document.

If we do not hear from you in

this regard within the specified period, the report will be placed in the

Public Doct. ment Room.

T 9 0 5 2 9 9 7 o.y

-

-

?A,7 -

onr7

1

,

-

?

G

JL

.

,

.

.

.

.

MM 21 1979

.

Duke Power Company

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

$-

Richard C. Lewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosure:

Inspection Report No. 50-369/79-17

cc w/ enc 1:

M. D. McIntosh, Plant Manager

P. O. Box 488

Cornelius, N C 28031

J. C. Rogers, Project Manager

P. O. Box 33189

Charlotte, N C 28242

3 2--248 -

nc-

325

_ . .. . .

._

-