ML19289E483
| ML19289E483 | |
| Person / Time | |
|---|---|
| Site: | 07000734 |
| Issue date: | 12/31/1978 |
| From: | GENERAL ATOMICS (FORMERLY GA TECHNOLOGIES, INC./GENER |
| To: | |
| Shared Package | |
| ML19289E481 | List: |
| References | |
| NUDOCS 7904210108 | |
| Download: ML19289E483 (4) | |
Text
R. H. Engelken 696-1035 TABLE I 1978 GAS & PARTICULATE EFFLUENTS - 1 JULY THROUGH 31 DECEMBER Emission Rate Release Point Building No.
Effluent (Ci/6 mo.)
8 x 10 '
SVA 37 Gross Alpha SVB(
39 Gross Alpha 1.0 x 10
~
-7 Science Buildings (
2 Tritium 2 x 10
-3 (A, B, & C)
Krypton-85 5 x 10 1.0 x 10 '
Uranium-235
-5 Thorium-232 2.2 x 10
-0 Niobium-95 3 x 10 Zr-95 3 x 10~
1.0 x 10 '
Uranium-238
-3 Xenon-127 5 x 10
~0 Incinerator 25 Uranium-235 1.1 x 10
-0 Thorium-232 1.1 x 10 Experimental Bldg.(
9 Ba-133 5 x 10~
Ce-144 5 x 10~
~
Cs-137 5 x 10
~
Fe-59 5 x 10
~7 Gd-159 5 x 10
~
Cr-51 5 x 10 Ru-103 5 x 10'
~
Sb-125 5 x 10
-7 Tc-95 5 x 10
-7 Zr-95 5 x 10
-5 I-131 5 x 10
-5 Alpha 9 x 10
-5 Beta 8 x 10
-5 TRIGA Fuel Fabrication 22 Gross Alpha 5.0 x 10 7so421t>Io %
Page 1 of 2
R.
H'. Engelken 696-1035 TABLE I 1978 GAS & PARTICULATE EFFLUENTS - 1 JULY THROUGH 31 DECEMBER Emission Rate Release Point Building No.
Effluent (Ci/6 mo.)
Hot Cell' }
23 Krypton-85 5.0 x 10
~
Mixed Fission
-4 Products 5 x 10
-4 Iodine-131 5 x 10
-3 EAI(
27 Tritium 3.5 x 10 Mixed Fission
-3 Products 1.5 x 10
-6 Cobalt-60 5 x 10
-2 Krypton-85 8 x 10
-2 Xenon-133 5.0 x 10 Mixed Activation
~3 Products 1.5 x 10
~I TRIGA Reactor Facility ( }
21 Argon-41 4.5 x 10
-3 Krypton-85 3 x 10
(
Fuel Development 21 Cesium-137 5 x 10~
esearch M s Mixed Fission
-3 Products 2.5 x 10
-3 Krypton-85 2.5 x 10
-4 Eu-154, 155 5 x 10
-2 Special Products Bldg.(
SP-2 Krypton-85 12 10
~
Xenon-133 1 x 10 Waste Processing Facility (
25 Mixed Fission
-8 Products 5 x 10 Mixed Activation
-8 Products 5 x 10
-6 Uranium-235 1.1 x 10
-6 Thorium-232 1.1 x 10 (1) Measured (2) Estimated from effluent surveys.
(3) Calculated facility release.
Page 2 of 2
m R. H. Engelken 696-1035 TABLE II 1978 LIQUID EFFLUENTS - 1 JULY THROUGH 31 DECEMBER Emission Rate Release Point Building No.
Effluent (Ci/6 mo.)
SVA to Sanitary Sewer 37 Uranium-235 1.2 x 10 '
~
t
R.- H. Ehgelken 696-1035 TABLE III 1978 NON-RADIOLOGICAL EFFLUENT DATA - 1 JULY THROUGH 31 DECEMBER A. Suspended Particulates Date of No. of Particulate Concentration Arithmetic H**"
3 Sample Collection Samples Range pg/M3 ug/M 24 - 30 July 1978 16 26 - 68 37.0 B. Hydrogen Chloride in Air Date of No. of Sample Collection Samples HCI (PPM)
Concentration ug/M 8 December 1978 2
0.08 101 14 September 1978 2
0.07 102 9
e