ML19289D826
| ML19289D826 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 02/05/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML19289D822 | List: |
| References | |
| NUDOCS 7903140564 | |
| Download: ML19289D826 (2) | |
See also: IR 05000369/1979003
Text
e
.
.
0
UNITED STATES
- gm R80 9'o
NUCLEAR REGULATORY COMMISSION
,
g
.
[
n
REGloN !!
$
101 M ARIETTA STR E ET. N.W.
5
-
p
ATLANTA. GEORGt A 3o303
b
/
y*****f
FEB
5 1979
In Reply Refer To:
RII:WBS
50-369/79-3
50-370/79-2
Duke Power Company
Atta:
Mr. William O. Parker, Jr.
Vice President, Steam Production
Post Office Box 33189
422 South Church Street
Charlotte, North Carolina 28242
Gentlenen:
This refers to the inspection conducted by Mr. W. B. Swan of this office
on January 9-11, 1979 of activities authorized by NRC License Nos.
CPPR-83 and CPPR-84 for the McGuire Nuclear Station facilities, Units 1
and 2 and to the discussion of our findings held with Mr. J. C. Rogers
at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report.
Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
,
the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure.
Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
7 00314 0 ffd $/
4 . , _
.
.
FEB
5 1979
-
,
.
Duke Power Company
-2-
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
"
Charles E. Murp
, Chief
React,r Construction and
Engineering Support Branch
Enclosures:
Inspection Report Nos. 50-369/79-3
and 50-370/79-2
cc w/ enclosures:
Mr. M. D. McIntosh, Plant Manager
McGuire Nuclear Station
Post Office Box 488
Cornelius, North Carolina 28031
Mr. J. C. Rogers, Project Manager
McGuire Nuclear Station
Post Office Box 33189
Charlotte, North Caro. lina 28242
.
D