4
.
UNITED STATES
pm Rf Coq (o
NUCLEAR REGULATORY COMMISSION
g
,
REGloN 11
) y,
g
3
" " ' -
E
101 M ARIETTA sTRE ET, N.W.
8
ATLANTA. GEORGI A 30303
DEC 1
1978
.....
In Reply Refer To:
RII: WAR
50-348/78-27
Alabama Power Company
,
ATTN:
Mr. A. R. Barton
Executive Vice President
Post Office Box 2641
Birmingham, Alabama 35291
/
Gentlemen:
/
This refers to the inspection conducted by Mr. V. Ruhlman and others of this
office on October 2-6,
1978, of activities authorized by NRC License No.
NPF-2 for the Farley I' nit 1 and APC0 Corporate Offices and to the discussion
of our findings held with Mr. W. G. Hairston on site and Mr. H. O. Thrash at
the corporate offices at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observati
by the inspectors.
Ten new unresolved items resulted from this inspection and are discussed in
the enclosed report. sThese items will be examined during subsequent
inspections.
C'
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements. These items
and references to pertinent requirements are listed in the Notice of
Violation enclosed herewith as Appendix A.
This notice is sent to you
pursuant to the provisions of Section 2.201 of the NRC's
" Rules of
Practice," Part 2,
Title 10, Code of Federal Regulations.
Section 2.201
requires you to submit to this office, within 20 days of your receipt of
this notice, a written statement or explanation in reply including:
(1)
corrective steps which have been taken by you and the results achieved; (2)
corrective =teps which will be taken to avoid further noncompliance; and
(3) the date when full compliance will be achieved.
790129 oM
.
.
.
Alabama Pcwer Company
-2-
DEC 1
B78
With respect to item D in Appendix A, your immediate corrective actions were
completed and verified by an inspector prior to comp 1>. tion of the inspection.
Therefore, your response for this item need only address actions taken and
scheduled to prevent recurrence.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room. If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20
days to this office to withhold such information from public disclosure.
Any such application must include a full statement of the reasons on the
basis of which it is claimed that the information is proprietary, and should
be prepared so that proprietary information identified in the application
is contained in a separate part of the document.
If we do not hear from
you in this regard within the specified period, the report will be placed
in the Public Document Roon.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
$n
w/
F. J. Long, Chi (
Reactor Operation and Nuclear
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-348/78-27
cc w/ encl:
Mr. W. G. Hairston, III, Plant Manager
Drawer 470
Ashford, Alabama 36312
.