ML19289C881

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-498/78-16 & 50-499/78-16.Requests Addl Info Re Recurrence Control Measures
ML19289C881
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 01/17/1979
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Eric Turner
HOUSTON LIGHTING & POWER CO.
Shared Package
ML19289C882 List:
References
NUDOCS 7901250361
Download: ML19289C881 (1)


See also: IR 05000498/1978016

Text

e 'sco

UNITED STATES

,

o

NUCLEAR REGULATORY COMMISSION

[

HEGION IV

o

$ ,$

$

611 RYAN PLAZA DRIVE, SUITE 1000

ARLINGTON, TEXAS 76011

%g * *,

,/

January 17, 1979

In Reply Refer To:

RIV

Docket No. 50-498/Rpt. 78-16

50-499/Rpt. 78-16

Houston Lighting and Power Company

ATTN:

E. A. Turner, Vice President

Power Production Construction

and Technical Services

Pcst Office Box 1700

Houston, Texas

77001

Gentlemen:

Thank you for your letter of January 8,1979, in response to our letter

dated November 15, 1978, and tne attached Notice of Violation.

As a

result of our review, we find that additional information, as discussed

with your Mr. T. D. Stanley during a telephone call on January 16, 1979,

is needed.

Specifically, your descriptions of recurrence control measures

for the three items of noncompliance should be expanded to state how the

measures are accomplished and documented and if the measures are in addi-

tion to routine quality assurance program requirements.

Should you have any questions concerning this matter, we will be pleased

to discuss them with you.

Sincerely,

4

.

-

W. C. Seid

, Chief

Reactor Construction and

Engineering Support Branch

79012503 61