ML19284A790
| ML19284A790 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 02/04/1980 |
| From: | Zelinsky W Office of Nuclear Reactor Regulation |
| To: | Wuller G ILLINOIS POWER CO. |
| References | |
| NUDOCS 8002150232 | |
| Download: ML19284A790 (1) | |
Text
/EY e
ut.'iT L D LI A!i s s
c 1
T'UCLE AR BEGUL Al ORY CO: ' " c 'J I O N l
5 i
V. ASW.G T ON, D C. 20L55 y/ l
~ ',,,.
- Docket l'os. 50-461 50-462 FEB -i
...d Mr. George Wuller Licensing Coordinator Illinois Power Company 500 South 27th Street Decatur, Illinois 62525
Dear fir. Uuller:
CLIfiT0ii POWER STATI0fi, VilITS 1 & 2 Our records do not indicate receipt as yet of information identified in Regulatory Guide 9.3 (copy attached) in connection with the operating license review of the captioned nuclear plant. We would appreciate it if you could supply the information as soon as possible, so that we can complete our findings as to whether any significant changes have occurred subsequent to the previous construction permit antitrust review that would warrant another review at the operating license review stage.
Sincerely, 6
On,
)
.n William M. ZeliWsky Electrical Engineer Power Supply Analysis Section Antitrust & Indemnity Group Office of fluclear Reactor Regulation
Enclosure:
232 8002150