ML19284A790

From kanterella
Jump to navigation Jump to search
Requests Info Identified in Reg Guide 9.3 Per Facility OL Review.Significant Changes Subsequent to Previous CP Antitrust Review Would Warrant Addl NRC Review at OL Review Stage
ML19284A790
Person / Time
Site: Clinton  Constellation icon.png
Issue date: 02/04/1980
From: Zelinsky W
Office of Nuclear Reactor Regulation
To: Wuller G
ILLINOIS POWER CO.
References
NUDOCS 8002150232
Download: ML19284A790 (1)


Text

/EY e

ut.'iT L D LI A!i s s

c 1

T'UCLE AR BEGUL Al ORY CO: ' " c 'J I O N l

5 i

V. ASW.G T ON, D C. 20L55 y/ l

~ ',,,.

  • Docket l'os. 50-461 50-462 FEB -i

...d Mr. George Wuller Licensing Coordinator Illinois Power Company 500 South 27th Street Decatur, Illinois 62525

Dear fir. Uuller:

CLIfiT0ii POWER STATI0fi, VilITS 1 & 2 Our records do not indicate receipt as yet of information identified in Regulatory Guide 9.3 (copy attached) in connection with the operating license review of the captioned nuclear plant. We would appreciate it if you could supply the information as soon as possible, so that we can complete our findings as to whether any significant changes have occurred subsequent to the previous construction permit antitrust review that would warrant another review at the operating license review stage.

Sincerely, 6

On,

)

.n William M. ZeliWsky Electrical Engineer Power Supply Analysis Section Antitrust & Indemnity Group Office of fluclear Reactor Regulation

Enclosure:

Regulatory Guide 9.3 V(

232 8002150