Forwards IE Insp Rept 50-213/79-02 on 790130-0201.No Noncompliance Noted
ML19282C657
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 02/22/1979
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML19282C658 List:
References
NUDOCS 7903300503
Download: ML19282C657 (2)


See also: IR 05000213/1979002

Text

p # "UW

UNITED STATES

t

4

yq

g

NUCLEAR REGULATORY cOMMisslON

5g'\\y)s

(

S

REGION 1

G E

631 PARK AVENUE

0, '* N

KING OF PRUSSI A. PENNSYLVANI A 19406

,

%/

o

2 2 FEB 1979

Docket No. 50-213

Connecticut Yankee Atomic Power Company

ATTN: Mr. W. G. Counsil

Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject:

Inspection 50-213/79-02

This refers to the inspection conducted by Mr. J. C. Higgins of this

office on January 30 - February 1,1979, at the Haddam Neck Plant,

Haddam, Connecticut, of activities authorized by NRC License No. DPR-61

and to the discussions of our findings held by Mr. Higgins with Mr. R.

Traggio of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within thesa areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Our inspector also verified the steps you have taken to correct the item

of noncompliance brought to your attention in a letter dated November

30, 1977. We have no further questions regarding your action at this

time.

Within the scope of this inspection, no items of noncompliance were.

observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractor)

believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such information

from public disclosure.

Any such application must be accompanied by an

affidavit executed by the owner of the information, which identifies the

7903300yc3

.

.

Connecticut Yankee Atomic Power

2

2 2 FEB 1979

Company

document or part sought to be withheld, and which contains a statement

of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b)(4) of Section

2.790. The information sought to be withheld shall be incorporated as

far as possible into a separate part of the affidavit.

If we do not

hear from you in this regard within the specified period, the report

will be placed in the Public Document Room.

No reply to this letter is required; however, if you should have any

questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

"

.

=m

<

A

Eldon J.

runner,

e

Reactor Operations and Nuclear

Support Branch

Enclosure: Office of Inspection and Enforcement Inspection

Report Number 50-213/79-02

cc w/ encl:

R. Graves, Plant Superintendent

D. G. Diedrick, Manager of Quality Assurance

J. R. Himmelwright, Licensing Safeguards Engineer

.