ML19282C591

From kanterella
Jump to navigation Jump to search
Forwards LERs 79-022/03L-0 & 79-028/03L-0
Date released: 10/23/2019 Download: ML19282C591


LER 79-022/03L-0 on 790227:power Supply to Post DBA H Recombiner Deenergized Rendering Recombiner Inoperable for 4-h.Caused by Deenergizing of Motor Control Center to Perform Voltage Measurements
ML19282C596
Person / Time
Site: North Anna Dominion icon.png
Issue date: 03/26/1979
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19282C596 (1)
LER 79-028/03L-0 on 790225:greater than 12-step Disagreement Noted Among Rod Position Indication,Computer Position Indication & Demand Signal Indication for Rod 9.Caused by Voltage Drift in Signal Conditioning Card
ML19282C593
Person / Time
Site: North Anna Dominion icon.png
Issue date: 03/26/1979
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19282C593 (2)
Forwards LERs 79-022/03L-0 & 79-028/03L-0
ML19282C590
Person / Time
Site: North Anna Dominion icon.png
Issue date: 03/27/1979
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19282C590 (1)