05000338/LER-1979-028-03, /03L-0 on 790225:greater than 12-step Disagreement Noted Among Rod Position Indication,Computer Position Indication & Demand Signal Indication for Rod 9.Caused by Voltage Drift in Signal Conditioning Card

From kanterella
(Redirected from ML19282C593)
Jump to navigation Jump to search
/03L-0 on 790225:greater than 12-step Disagreement Noted Among Rod Position Indication,Computer Position Indication & Demand Signal Indication for Rod 9.Caused by Voltage Drift in Signal Conditioning Card
ML19282C593
Person / Time
Site: North Anna Dominion icon.png
Issue date: 03/26/1979
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19282C591 List:
References
LER-79-028-03L, LER-79-28-3L, NUDOCS 7903300370
Download: ML19282C593 (2)


LER-1979-028, /03L-0 on 790225:greater than 12-step Disagreement Noted Among Rod Position Indication,Computer Position Indication & Demand Signal Indication for Rod 9.Caused by Voltage Drift in Signal Conditioning Card
Event date:
Report date:
3381979028R03 - NRC Website

text

N

.a

  • ^

(7 77)'

LICENSEE EVENT REPORT h CONTROL BLOCK: l l

l l

l l j (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6

lO ' i l I V l A l N l A l S l 1 l@l 0 0 l-1010 01010 l-l0 lo l@l4 l1 ll 11 Il l@l l

l@

7 8 9 LICENSEE COT)E 14 15 LICENSE NUYBER 25 7ti LICENSE TYPE Ju 57 C A T 58 CON'T 10111 3f nN l L l@l 015 l 01010 l 3 3 l8 l@l 012 2151719 l@l d 31 2l Gl 71 oj @

8 69 61 DOCK ET P. UMBER 63 69 EVENT DATE 74 25 REPORT DATE 83 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h

' During Mode 2 operation, a greater than 12 sten disaareement was noted between rod i

O 2

l position indication, computer position indication and demand signal indication for l

O 3

1014ll rod N09. This was contrary to T.S. 3.1.3.2.

Reactor power was 4.05 durina this time I lO13l l and therefore action statement a.2 of T.S. 3.1.3.2 was satisfied.

This event is I

loisI reportable as per T.S. 6.9.1.9.b.

j 10171 1 I

l LO a

OE CODE SUBCO E COMPON ENT CODE SUBC dE S

ODE 10191

'lIIF @ [ E_j @ [f._j @ lI IN ls IT lR bl l@ [_I_j@ [lj @

7 8

9 10 11 12 13 18 19 20 SEQUE NTI AL OCCURRENCE REPORT REVISION LE R EVENT YE AR REPORT NO.

CODE TYPE NO.

@yggRO l 719 l-l l 0 l 21 81 l_/_]

l013 lL l

[ _j.

[_QJ R

_ 21 22 23 24 26 27 23 29 30 31 32 TAKEP A

O ON PL PT MET HOURS SB IT FORA 8.

SUPPLIE MANUFACTURER lE l@Q@

l Zl@

Q@

0 10 l0 10

[_Yj @

l N I@

l Nl@

lW ll 21 Ol@

33 34 35 36 3/

40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS 27 i

O IThe cause for this indicator disaareomant was dun tn vn1tano drift in tha sinnal I

lilii lconditioning card.

Immediate corrective action was tn rocalibrato anef

+n nnrrnen I

Lig l functional checks.

Both of which were done satisfactorily.

I l i 131 l li l41 I l

7 8 9 80 ST S

% POWE R OTHF

.TUS DIS OV RY DISCOVERY DESCRIPTION l t 15 l l C l@ l 0l Ol 4l@l N/A l

lBl@l Operator Observation I

A TIVITY CO TENT RELE ASED OF RELE ASE AYOUNT OF ACTivlTY LOCATION OF RELEASE Ii le l [ Z,j @ [_Zj@l N/A l

N/A l

PERSONNet ExPOSMES DESCRIPTION @

NUMBER TYPE I t l 71 1010 l 0 l@l Z l@l N/A PERSONNE t iNau' RIES DESCRIPTION @

NUV8ER 101010l@l N/A l

i a 7

8 9 11 12 80 LOSS OF OH DAMAGE TO FACILITY Q TYPE

DESCRIPTION

v Zl@l N/A i 9 7

8 9 10 89 l 2 l o l [fLf@DESCRi'TIONl ryon<7<1nM O/YA l1llll1llIIIIf tSSUE

  • U"""""'

/ U 63 69 80 5 1

8 9 10 W. R. Cartwright PHONE:

703-b90'blbl NAME OF PREPARER

Virginia Electric and Power Company North Anna Power Station Unit #1

Attachment:

Page 1 of 1 Docket No.

50-338 Report No.

LER 79-028/03L-0

Description of Event

During mode 2 eperation in preparation for shifting to mode 1 operation a greater than 12 step discrepancy was noted for rod position indication for rod N09.

This was contrary of T.S. 3.1.3.2.

Reactor power at the time of this discrepancy was 4% steady state.

Therefore the requirements of action statement a.2 were already met.

_ obable Consequences of Event:

Pr Operability of the control rod position indication is required to deter-mine control rod position and thereby ensure compliance with the control rod alignment and insertion limits.

Since reactor power was below 50% there was no effect on the safe operation of the plant and the health and safety of the genera: public was not endangered.

Cause of Occurrence The cause of the indicator disagreement was due to voltage drift in the signal conditioning card.

Immediate Corrective Action

Recalibration and functional checks were performed on Rod Position Indication for rod N09.

Both were performed satisfactorily.

Scheduled Corrective Action:

An engineering study of IRPI drift is already in progress.

A_ction Taken To Prevent Recurrence:

No further action required at this time.