05000338/LER-1979-022-03, /03L-0 on 790227:power Supply to Post DBA H Recombiner Deenergized Rendering Recombiner Inoperable for 4-h.Caused by Deenergizing of Motor Control Center to Perform Voltage Measurements

From kanterella
(Redirected from ML19282C596)
Jump to navigation Jump to search
/03L-0 on 790227:power Supply to Post DBA H Recombiner Deenergized Rendering Recombiner Inoperable for 4-h.Caused by Deenergizing of Motor Control Center to Perform Voltage Measurements
ML19282C596
Person / Time
Site: North Anna Dominion icon.png
Issue date: 03/26/1979
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19282C591 List:
References
LER-79-022-03L, LER-79-22-3L, NUDOCS 7903300372
Download: ML19282C596 (1)


LER-1979-022, /03L-0 on 790227:power Supply to Post DBA H Recombiner Deenergized Rendering Recombiner Inoperable for 4-h.Caused by Deenergizing of Motor Control Center to Perform Voltage Measurements
Event date:
Report date:
3381979022R03 - NRC Website

text

NRC FORM 3GG U.S. NUCLE AR R EGULATORY COMMISSION (7-77)

LICENSEE EVENT REPORT CONTROL eLocK: l l

l

]

l l

}@

(PLEASE PRINT OR TYPE ALL REQUIRED INFORMATIONI lVIAlNlAlSl1l@!0 0

0l 0l 0 0l 0 -l0l0 @l4l1l1l1l1 @l l

l@

0 1

7 8 9 LICENSEE CODE 14 13 LfCENSE NuYBER 22 26 LICE?.>E T ) FE JJ bl C A 1 SS CON'T

, GOR r Llgl0]5l0l0[0l3 3 l 8 l@l 0 l 212 l 717 l 91@l ol 31 oi s ] 7l O l@

H O

i

?

8 t,U 61 DOCK E T NUYdER ta 6J EVENT DATE 74 75 HEPORT DA IL 80 EVEN T DESCRIPTION AND PROBABLE CONSEQUENCES h lDuring normal power operations, the power supply to the Unit #2 post DBA Hydrogen 1

a 2

[0,3, ;Recombiner was deenergized. This action rendered the Hydrogen Recombiner, 2-HC-HC-1, I

[D i4 i [ inoperable for four hours.

This event did not jeopardize the health and safety of I

O 5

Ithe general public as the unit 1 recombir.er was still available.

Reportable oursuant 1 el lto T.S. 6.9.1.9.b.

l 0

10171 1 l

O 8

l OE CODE SUSCO E COMPONENT CODE SUBC DE SU E

lS Cl @ [XJ@ l X l @ I C l H I T l B l R l K l@ [_AJ@ Lzj @

O 9 7

8 9

10 11 12 13 18 19 20 SE QU E N TI A '.

OCCURRENCE REPORT REVISION LE R 'RO EVENT YE AR R EPORT NG.

CODE TYPE NO.

@ Ng=

17 19I l1 I o 1212 I I/I n

, I LLJ

[-j l Ol H

21 22 23 24 26 27 28 29

.70 31 32 AKEN A T N ON PLA T MET HOURS SB IT FOR1 8.

SU PLIE MAN FACTURER IX l@lzi@

Lz_j@

[ z l@

3/l01010l0 LNj@

Nl@

Al@

W ll 1211 l@

J3 34 35 36 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h IMotor control center MCC 2Hl-2S was deenergi7ed in nrdar tn norfnrm un1+nnn I

i O

i li Lmeasurements which were required on emergency A-C nnwor eyetom mnauientient tn hn I

it mplemented on Unit 1 for degraded voltaae Drotection.

As snnn as the enaarrnmonte l

i 2

IiI3I hiere completed, MCC 2Hl-2S was reeneraized.

I t i l41 I I

7 8 9 80 ST S

% POWER OTHER STATUS DIS O RY DISCOVERY DESCRIPTION LE_j@

Ol9I81@l NA l

l l@l l

i s ACTIVITY CO TENT AYOUNT OF ACTIVITY @ l LOCATION OF RREASE @

REMASED OF RELE ASE LZ_l@ Lzj@l nA nn I

i c PERSO~NEL Ex.OSSES DESCR,PTiO l @

NuuaER Tm l0l0l0l@[_j@l NA I

i 7 So

,EnSONNa'IN,unS NUMBER

DESCRIPTION

A lo 1010 l@l NA I

7 8 9 11 12 80 LOSS OF OR OAMAGE TO FACILITY TYPE DE SCRIPTION Ii 19 I lzj@l NA l

7 E 9 10 80 1RSUE @OYSCRIPTION IN l l

NA

_j liIIIIIIIIIIl5 2 o 7

8 9 10 63 69 80 5 0