ML19282C270

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-282/79-01 & 50-306/79-01 on 790102-31 & Notice of Violation
ML19282C270
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 02/15/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wachter L
NORTHERN STATES POWER CO.
Shared Package
ML19282C271 List:
References
NUDOCS 7903220460
Download: ML19282C270 (2)


See also: IR 05000282/1979001

Text

I

.

c#

%,

UNITED STATES

NUCLEAR REGULATORY COMMISSION

'

yg

.,g

j I,[f' ,

j

REGloN lli

e

c

799 RooSEVE LT ROAD

i

G LE N E LL YN. iL LINois 60137

<%, . . . . . .g

g ,g

FEB 1 b .J79

Docket No. 50-282

Docket No. 50-306

Northern States Power Company

ATTN:

Mr. Leo Wachter

Vice Precident

Power Production and

System Operation

414 Nicollet Mall

Minneapolis, MN

35401

Gentlemen:

This refers to the inspection conducted by Mr. C. D. Feierabend

of this office on January 2-31, 1979, of activities in your

corporate office and at Prairie Island Nuclear Generating Plant,

Units 1 and 2, authorized by NRC Operating Licenses No. DPR-42

and No. DPR-60 and to the discussion of our findings with

Mr. Tierney and others of your staff at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the

inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with

personnel.

During this inspection, certain of your activities appeared

to be in noncompliance with NRC requirements, as described

in the enclosed Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations.

Section 2.201 requires you

to submit to this of fice within twenty days of your receipt

of this notice a written statement or explanation in reply,

including for each item of noncompliance: (1) corrective

action taken and the results achieved; (2) corrective action

to be taken to avoid further noncompliance; and (3) the date

when full compliance will be achieved.

7903220 460

_

.

Northern States Power

-2-

f[B 1 5 .J79

Company

In accordance with Section 2.790 of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations, a

copy of this letter, the enclosures, and your response to

this letter will be placed in the NRC's Public Document Room,

except as follows.

If the enclosures contain information

that you or your contractors believe to be proprietary, you

must apply in writing to this office, within twenty days of

your receipt of this letter, to withhold such information

from public disclosure.

The application must include a full

statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary

information identified in the application is contained in an

enclosure to the application.

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

$&

Gaston Flerelli, Chief

Reactor Operations and

Nuclear Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Rpts.

No. 50-282/79-01 and

No. 50-306/79-01

cc w/encls:

Mr. F. P. Tierney, Jr.,

Plant lianager

John W. Ferman, Ph.D.

Nuclear Engineer, MPCA

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC