Text
.
.
.
.d
p* 8800g'o
UNITED STATES
(
NUCLEAR REGULATORY COMMISSION
g
REGloM ll
g
)
g
e-
3 g
101 MARIETTA STREET.N.W.
" .../
o
ATLANTA, GEORGIA 3o303
%..v
In Reply Refer To:
JAN 2 61979
RII:CMH
50-321/79-1
50-366/79-1
Georgia Power Company
ATTN:
Mr. J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street, N.W.
Atlanta, Georgia 30303
Gentlemen:
This refers to the inspe lion conducted by Mr. C. M. Hosey of this
office on January 3-5, 1979 of activities authorized by NRC License Nos.
DPR-57 and NPF-5 for the Hatch 1 and 2 facilities, and to the discussion
of our findings held with Mr. M. Manry at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
We have examined actions you have taken with regard to previously reported
unresolved items. The status of these items is discussed in the enclosed
report.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements. These
items and references to pertinent requirements are listed in the Notice
of Violation enclosed herewith as Appendix A.
This notice is sent to
you pursuant to the provisions of Section 2.201 of the NRC's " Rules of
Practice", Part 2, Title 10, Code of Federal Regulations.
Section 2.201
requires you to submit to this office, within 20 days of your receipt of
this notice, a written statement or explanation in reply including:
(1)
corrective steps which have been taken by you, and the results achieved;
(2) corrective steps which will ue taken to avoid further noncompliance;
and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contrac-
tor) believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such information
from public disclosure. Any such application must include a full state:-at
of the reasons on the basis of which it is c1 aimed that the information
,
7903150287
-
.
"
'
JAti 2 61979
-
.s
s
Georgia Power Company
-2-
is proprietary, and should be prepared so that proprietary information
identified in the application is contained in a separate part of the
document.
If we do not hear from you in this regard within the specified
period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
CY
.
Jack T. Sutherland, Chief
Fuel Facility and Materials
Safety Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-321/79-1 and
50-366/79-1
cc w/ enclosures:
Mr. M. Manry, Plant Manager
Plant E. I. Hatch
Post Office Box 442
Baxley, Georgia 31513
Mr. C. E. Belflower
Site QA Supervisor
Plant E. I. Hatch
Post Office Box 442
Baxley, Georgia 31513
.