ML19282B313

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-373/78-31 & 50-374/78-22 on 791206 & 12-13.No Noncompliance Noted
ML19282B313
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 02/01/1979
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML19282B314 List:
References
NUDOCS 7903130066
Download: ML19282B313 (2)


See also: IR 05000373/1978031

Text

1-

.

'

e

d

j

'<,

UNIT E D STATES

/ ,g j

  • g

'

NUCLE A R REGULATORY COMMISSION

e

j

. .-

g

nEwor. e,

31 yn

,5

m w>om , w

,

$

si ,

<,i E N t t t v N. i t t e.g., <:

%,

.

  • ..

. . .

Docket No. 50-373

Docket No. 50-374

Commonwealth Edison Company

ATTN:

Mr. Byron Lee, Jr.

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the inspection conducted by Messrs. C. M. Erb and

F. C. Hawkins of this office on December 6, 12 and 13, 1978, of

activities at La Salle County Nuclear Station, Units 1 and 2,

authorized by NRC Construction Permits No. CPPR-99 and No. CPPR-100

and to the discussion of our findings with Mr. R. Legner, Mr. R. Rose

and others at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the

inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with

personnel.

No items of noncompliance with NRC requirements were identified

during the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this

letter and the enclosed inspection report will be placed in the

NRC's Public Document Room, except as follows.

If this report

contains information that you or your contractors believe to be

proprietary, you must apply in writing to this of fice, within

twenty days of your receipt of this letter, to withhold such

information from public disclosure.

The application must include

a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary

information identified in the application is contained in an

en losure to the application.

7 9 0 313 0 0GG

.

.

,

.

Commonwealth Edison

-2-

Company

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

U

'

/

s

/ . F. Heishman, Chief

R

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

Reports No. 50-373/78-31

and No. 50-374/78-22

cc w/ encl:

Mr. L. J. Burke, Site

Project Superintendent

Mr. R. J. Legner, Quality

Assurance Supervisor

Central Files

Reproduction Unit NRC 20b

/ PDR

Local PDR

NSIC

,

TIC

Mr. Dean liansell, Office of

Assistant Attorney General