Text
1-
.
'
e
d
j
'<,
UNIT E D STATES
/ ,g j
- g
'
NUCLE A R REGULATORY COMMISSION
e
j
- . .-
g
nEwor. e,
31 yn
,5
m w>om , w
,
$
si ,
<,i E N t t t v N. i t t e.g., <:
%,
.
- ..
. . .
Docket No. 50-373
Docket No. 50-374
Commonwealth Edison Company
ATTN:
Mr. Byron Lee, Jr.
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the inspection conducted by Messrs. C. M. Erb and
F. C. Hawkins of this office on December 6, 12 and 13, 1978, of
activities at La Salle County Nuclear Station, Units 1 and 2,
authorized by NRC Construction Permits No. CPPR-99 and No. CPPR-100
and to the discussion of our findings with Mr. R. Legner, Mr. R. Rose
and others at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas
examined during the inspection. Within these areas, the
inspection consisted of a selective examination of procedures
and representative records, observations, and interviews with
personnel.
No items of noncompliance with NRC requirements were identified
during the course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this
letter and the enclosed inspection report will be placed in the
NRC's Public Document Room, except as follows.
If this report
contains information that you or your contractors believe to be
proprietary, you must apply in writing to this of fice, within
twenty days of your receipt of this letter, to withhold such
information from public disclosure.
The application must include
a full statement of the reasons for which the information is con-
sidered proprietary, and should be prepared so that proprietary
information identified in the application is contained in an
en losure to the application.
7 9 0 313 0 0GG
.
.
,
.
Commonwealth Edison
-2-
Company
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
U
'
/
s
/ . F. Heishman, Chief
R
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection
Reports No. 50-373/78-31
and No. 50-374/78-22
cc w/ encl:
Mr. L. J. Burke, Site
Project Superintendent
Mr. R. J. Legner, Quality
Assurance Supervisor
Central Files
Reproduction Unit NRC 20b
/ PDR
Local PDR
,
Mr. Dean liansell, Office of
Assistant Attorney General