ML19282B218

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-331/79-03 on 790201.Notice of Violation Withheld (Ref 10CFR2.790)
ML19282B218
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 02/20/1979
From: Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Arnold P
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
Shared Package
ML19282B219 List:
References
NUDOCS 7903090398
Download: ML19282B218 (2)


See also: IR 05000331/1979003

Text

.

L

UNITED STATES

cf

4

=

,t

NUCLEAR REGULATORY COMMISSION

F,

<-

f ,i1

j

1

REGloN 111

f

799 ROOSEVELT ROAD

%,

6gj

8

GLE N E LLYN, ILLINOIS 60137

j

FEB 2 0 Jo

Iowa Electric Light and Power

Company

ATIN:

Mr. Duane Arnold

President

IE Towers

Post Office Box 351

Cedar Rapids, IA 52406

Gentlemen:

This refers to the inspection conducted by Messrs.

T. J. Madeda

and J. L. Belanger of this office on February 1, 1979, of activities

at the Duane Arnold Energy Center authorized by NRC Operating

License No. DPR-49 and to the discussion of our findings with

Mr. E. Hammond and other members of your staff at the conclusion

of the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the

inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with

personnel.

During this inspection, certain of your activities appeared

to be in noncompliance with NRC requirements, as described

in the enclosed Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations.

Section 2.201 requires you

to submit to this office within twenty days of your receipt

of this notice a written statement or explanation in reply,

including for each item of noncompliance: (1) corrective

action taken and the results achieved; (2) corrective action

to be taken to avoid further noncompliance; and (3) the date

when full compliance wt'l be achieved.

7903090 d

-

.,

$-

IL U) . . '

.

Iowa Electric Light and Power

-2-

Company

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

'

k

/-

v J. A. Hind, Chief p

Safeguards Branch

Enclosures:

1.

Appendix A, Notice of

Violation

2.

IE Inspection Rpt

No. 50-331/79-03

(Part 2.790(d) Information)

cc w/encls:

Central Files

Reproduction Unit NRC 20b

Mr. E. L. Hammond, Chief Engineer

cc w/o encls:

PDR

Local PDR