Forwards IE Insp Rept 50-293/78-28 on 781213-14.No Noncompliace Noted
ML19282B192
Person / Time
Site: Pilgrim
Issue date: 01/23/1979
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Andognini G
BOSTON EDISON CO.
Shared Package
ML19282B193 List:
References
NUDOCS 7903090346
Download: ML19282B192 (2)


See also: IR 05000293/1978028

Text

'.

M

..g#

OW

UNITED STATES

g

[

NUCLEAR REGULATORY COMMISSION

{

.f

g

REGION I

C

631 PARK AVENUE

KING OF PRUS$1A. PENNSYLVANI A 19406

.....

Docket No. 50-293

Boston Edison Company M/C Nuclear

ATTN: Mr. G. Carl Andognini, Manager

Nuclear Operations Department

800 Boylston Street

Boston, Massachusetts 02199

Gentlemen:

Subject:

Inspection 50-293/78-28

This refers to the inspection conducted by Dr. Bores of this office on

December 13 and 14,1978 at Pilgrim Nuclear Power Station, Plymouth,

Massachusetts of activities authorized by NRC License No. DPR-35 and to

the discussions of our findings held by Dr. Bores with Mr. McGuire and

Mr. Balfour of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractor)

believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such information

from public disclosure.

Any such application must be accompanied by an

affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement

of reasons which addresses with specificity the items which will be

considered by the Comission as listed in subparagraph (b) (4) of Section

2.790. The information sought to be withheld shall be incorporated as

far as possible into a separate part of the affidavit.

If we do not

hear from you in this regard within the specified period, the report

will be placed in the Public Document Room.

79030903Ab

'

..

.

Boston Edison Company M/C Nuclear

2

No reply to this letter is required; however, should you have any

questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

7

4

w

Ge 'ge H. Smith, Chief

Fu

Facility and Materials Safety

B anch

Enclosure: Office of Inspection and Enforcement Inspection

Report Number 50-293/78-28

cc w/ enc 1:

P. J. McGuire, Pilgrim Station Manager

A. Z. Roisman, Natural Resources Defense Council (Without Report)

.