ML19281A420
| ML19281A420 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 01/25/1979 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Niav Hughes TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19281A421 | List: |
| References | |
| NUDOCS 7903130206 | |
| Download: ML19281A420 (2) | |
See also: IR 05000327/1979002
Text
~~
.
.
,
..
.
,she
.
f(p@* "84
9
xUNITED STATES
jo,
NUCLEAR REGULATORY COMMISSIOb8
h-8dP7
I
REGloN il
E
to1 MARIETTA STREET, N.W.
- - -
,:
'
ATLANTA, GEORGIA 3o3o3
o
N H TN M
_
,,,,,
In Reply *-fer To:
RII:TJD
50-327/79-2
Tennessee Valley Authority
Atta: Mr. N. B. Hughes
Manager of Power
830 Power Building
Chattanooga, Tennessee 37401
Gentlemen:
This refers to the inspection conducted by Mr. Thomas J. Donat of this
office on January 3-5, 1979 of activities authorized by NRC License
Number CPPR-72 for the Sequoyah, Unit 1 facility, and to the discussion
of our findings held with Mr. W. F. Popp at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncocpliance were
disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
,
regard within the specified period, the report will be placed in the
Public Document Room.
700313 0 Ao/f
i.. _ ._
._
_
..
..
.
.
Tennessee Valley Authority
-2-<
JAN 2 51979
-
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
[.C.
, Gc
}
F. J.
ong, Chief
/
Reactor Operations and
Nuclear Support Branch
Enclosure:
Inspection Report No. 50-327/79-2
cc w/ enclosure:
Mr. J. E. Gilleland
Assistant Manager of Power
830 Power Buildieg
Chattanooga, Tennessee 37401
Mr. G. G. Stack, Project Manager
Sequoyah Nuclear Plant
Post Office Box 2000
Daisy, Tennessee 37319
Mr. J. M. Ballentloe
Plant Superintendent
Sequoyah Nuclear Plant
Post Office Box 2000
Daisy, Tennessee 37319
Mr. J. F. Cox
400 Commerce Street
W9D214
Knoxville, Tennessee 37902
!