Forwards IE Insp Repts 50-321/79-02 & 50-366/79-02 on 790114-16.No Noncompliance Noted
ML19281A409
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 02/06/1979
From: Kenna W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19281A400 List:
References
NUDOCS 7903130175
Download: ML19281A409 (2)


See also: IR 05000321/1979002

Text

{{#Wiki_filter:. tka mic UNITED STATES (p oq'o, . . , NUCLEAR REGULATORY COMMISSION , g g REGloN 11 .- .c 101 M ARIETTA STRE ET, N.W. .

I ATLANTA, GEORGI A 30303 o %*****/ - In Reply Refer To: {{g _6 jgJg RII:JMF 50-321/79-2 50-366/79-2 Georgia Power Company Attn: Mr. J. H. Miller, Jr. Executive Vice President 270 Peachtree Street, N. W. Atlanta, Georgia 30303 Gentlemen: This refers to the inspection conducted by Mr. J. M. Fuchko of this office on January 14-16, 1979, of activities authorized by NRC Operating License No DPR-57 and NPF-5 at Hatch 1 and 2 and to the discussion of our findings held with Mr. M. Manry at the conclusion of the inspection. The area examined during this inspection was your program for safeguarding special nuclear material under the applicable provisions of Title 10, Code of Federal Regulations, Part 73, " Physical Protection of Plants and Materials." Within this area, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector. Within the scope of this inspection, no items of noncompliance were disclosed. We have examined actions you have taken with regard to previously identified enforcement matters. These are discussed in the enclosed inspection report. In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprie- . e e S 7003130 /7 S'

. - . e Georgia Power Company -2-

{{g _ g jg7g tary, and should be prepared so that proprie(ary information identified in , the application is contained in a separate part of the document. If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room. Should you have any questions concerning this letter, we will be glad to discuss them with you. Sincerely, . k<.,: 41& , v' W. B. Kenna , Chief

' Safeguards Branch Enclosure: Inspection Report Nos. 50-321/79-2 and 50-366/79-2 cc w/ encl: Mr. M. Manry, Plant Manager Plant E. I. Hatch ~ P. O. Box 442 Baxley, Georgia 31513

Mr. C. E. Belflower Site QA Supervisor Plant E. I. Hatch P. O. Box 442 . Baxley, Georgia 31513 . .