Forwards IE Insp Repts 50-269/79-02,50-270/79-02 & 50-287/79-02.No Noncompliance Noted
ML19281A381
Person / Time
Site: Oconee  
Issue date: 02/16/1979
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19281A378 List:
References
NUDOCS 7903130137
Download: ML19281A381 (2)


See also: IR 05000269/1979002

Text

',

.

.

  1. g5 R8%g

UNITED STATES

o,,

NUCLEAR REGULATORY COMMISSION

REGloN ll

g

g

E

101 MARIETTA STREET, N.W.

.: #

ATLANTA, GEORGI A 30303

o,s...../

In Reply Refer To:

RII:CMH

FEB 161979

50-269/79-2

50-270/79-2

50-287/79-2

Duke Power Company

Attn:

Mr. William O. Parker, Jr.

Vice President, Steam Production

Post Office Box 2178

422 South Church Street

Charlotte, North Carolina 28242

Gentlemen:

This refers to the inspection conducted by Mr. C. M. Hosey of this office on

January 15-19, 1979 of activities authorized by NRC License Nos. DPR-38,

DPR-47 and DPR-55 for the Oconee facility, Units 1, 2 and 3, and to the

discussion of our findings held with Mr. J. E. Smith at the conclusion of

the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is

discussed in the enclosed report.

Within the scope of this inspection, no items of noncompliance were

disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within

'903 so;yf;

1

.

,

FEB 161979

.

Duke Power Company

-2-

20 days to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the

basis of which it is claimed that the information is proprietary, and should

be prepared so that proprietary information identified in the application is

contained in a separate part of the docurent.

If we do not hear from you in

this regard within the specified period, t ' e report will be placed in the

Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

/./4tt/ 'fh

[

tf

Jack T. Sutherland, Chief

Fuel Facility and Materials

Safety Branch

Enclosures:

Inspection Report Nos. 50-269/79-2,

50-270/79-2 and 50-287/79-2

cc w/ enclosures:

Mr. J. E. Smith, Station Manager

Oconee Nuclear Plant

Post Office Box 1175

Seneca, South Carolina 29678

-