Discusses Review for RESAR SP/90 Application for Preliminary Design Approval & Schedule for Module Submittal.Schedule Should Be Revised to Accomodate Specific Review Requirements
ML19277F283
Person / Time
Site: 05000601
Issue date: 11/18/1983
From: Noonan V
Office of Nuclear Reactor Regulation
To: Vollmer R
Office of Nuclear Reactor Regulation
Shared Package
ML19277F284 List:
References
FOIA-84-335 NUDOCS 8312090177
Download: ML19277F283 (1)


Text

-

r p

+

N; W

e L, %4j W,

.. xm

. - ~

h NOV1B N j

MEMORANDUM FOR:

Richard b. Vollmer, Director Division of Engineering THRU:

James P. Knight, Assistant Director Components & Structures Engineering Division of Engineering FROM:

Vincent S. Noonan, Chief Equipment Qualification Branch Division of Engineering

SUBJECT:

RESAR SP/90 ACCEPTANCE REVIEW The Equipment Qualification Branch has reviewed the RESAR SP/90 appli-cation for preliminary design approval and the schedule for module submittal.

It should be noted tnat the stated cbjective of preparation of a draft SER within three months after receipt of a module is dependent upon all requiied information being included in the module.

Any emissions will have an impact on this objective.

Also, since the Equipment Qualification review requires interfacing with a number of other branch reviews, there is a possibility of open items in the SER until the interfacing branches have completed their review.

It might be more beneficial if the schedule is revised to accommodate specific review requirements.

Vincent S. Noonan, Chief Equipment Qualification Branch Division of Engineering cc:

J. P. Knight C. Thomas G. Meycr R. LaGrange f

G. Bagchi M. Yost, EG&G J. Singh, INEL J

C. Kido, INEL

]y' J. Jackson A. Masciantonio 8312090177 831118 D

l CF SUBJ PROJ 668 CF

  • SEE NEXT PAGE FOR PREV 10'JS CONCURRENCES l

i i

DE/CSE

[

(7.4 yncq*DE/EQB

  • DE/EQB
  • EE/EQB
  • DE/ QB DE/EQB

.k............... JJackson GBagchi VNoo a PKni h spanaugg.Masciantonio 4

laGrange

./

oan >11/18/83 11/18/83 11/18/83 11/18/83 11/

/83

[....../. /83 1/

4.......

unc ronu aie no-soisacu o24o OFFICIAL RECORD COPY c u. po ma-=.2n

~m n. y.3.,

DISTRIBUTION Central File EQB Reading File MEMORANDUM FOR:

Richard H. Vollmer, Director Division of Engineering THRU:

James P. Knight, Assistant Director Components & Structures Engineering

(

Division of Engineering FROM:

'\\

Vincent S. Noont.n, Chief

/

\\EquipmentQualificatio,1 Branch D,ivision of Engineering

SUBJECT:

RESAR SP/90 ACCEPTANCE REVIEW x

The Equipment Qualification Branch.ias reviewed thy'RESAR SP/90 apoli-cation for preliminary de' ign approval and the sxfiedule for module s

submittal and finds them toxbe acceptable.

Ifshouldbenotedthat the stated objective of preparatira of a drpft SER within three months after receipt of'a module is dependent uppf1 all required information being included in the module.

Any omi sions will have an impact on this objective.

s

\\

\\

Vin' cent S. Noonan, Chief Equipment Qualification Branch DivisiogofEngineering cc:

J. P. Knight

\\

C. Thomas

\\

G. Meyer

/

G. Bagchi/g/

R. LaGran

/

/,

/

QC nbm DE/EQB gpm l/ DEf EQB DE/EQBgg 'p/EQ3' DE/EQB DE/CSE AMasciantoni a JJacGon "Es5Fsngi C2Ba gdlii"

' Vf(6ona n "dMtMsE sunnauch

'~ i/ (6/83 TT/[/8f 'llT '755 ',"TT/ ' '/5T o m, 11/,,/I /83 11/ j$ /83 l

NRC FORM 318 0 0-80) NRCM ON3 CFFICIAL RECORD COPY uw :9ei-w