Forwards IE Insp Rept 50-289/78-01 on 780110-11&16 & Notice of Violation
ML19276H259
Person / Time
Site: Crane Constellation icon.png
Issue date: 01/31/1978
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Herbein J
METROPOLITAN EDISON CO.
Shared Package
ML19276H251 List:
References
NUDOCS 7910150881
Download: ML19276H259 (2)


See also: IR 05000289/1978001

Text

"" %

t

UNITED STATES

g,k

NUCLEAR REGULATORY COMMisslON

,ib i f[ $

REGION I

,

~rA , y

-n

r

s31 PARK AVENUE

y g/

KING OF PRtJ551 A, PENNSYLVANI A 19404

'

.,,,.

~~"

Occket No. 50-239

31 ^

Metropolitan Edison Company

ATTN: Mr. J. G. Herbein

Vice President

~

P. O. Box 542

Reading, Pennsylvania 19603

Gentlemen:

.

.

Subject: Inspection 50-289/78-01

This refers to the inspection conducted by Mr. L. Sjostrom of this

office on January 10-11 and 16,1978, at Three Mile Island Nuclear

Station, Middletown, Pennsylvania, of activities authorized by NRC

License No. OPR-50 and to the discussions of our findings held by Mr.

Sjostrom with Mr. R. Barley of your staff at the conclusion of the

inspection, and to a subsequent telephona discussion between Mr. L.

Sjostrom and Mr. J. O'Hanlon on January 17, 1978.

.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective

G

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Based on the results of this inspection, it appears that one of your

activities was not conducted in full compliance with NRC requirements,

as set forth in the Notice of Violation, enclosed herewith as Appendix

A.

This item of noncompliance has been categorized into the levels as

described in our correspondence to you dated December 31, 1974.

This

notice is sent to you pursuant to the provisions of Section 2.201, of-

the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office, within twenty (20)

days of your receipt of this notice, a written statement or explanation

in reply including:

(1) 'cerrective steps which have been taken by you

and the results achieved; (2) corrective steos which will be taken to

avoid further items of noncompliance; and ('3) the date when full conpliance

will be achieved.

In addition to the need for corrective action regarding

this specific item of noncompliance, we are concerned about the implementation

of your management control systems that permitted it to occur.

Consequently,

in your reply, you should describe in particular, those actions taken or

planned to imorove the effectiveness of your management control systems.

1419 061

7 910150gf \\

.

.

Me:ropolitan Edison Com::any

2

.'. 1 3 1 1978

9

The Item of Noncompliance, shown in the Notice of Violation enclosed

witn this letter, is a recurrent item.

In your response please give

this matter your particular attention.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

-

2 Title 10, Code of Federal Regulations, a copy of this letter and the

enclosures will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to

be proprietary, it is necessary that you make a written application

within 20 days to this office te withhold such information from public

disclosure.

Any such application must be accompanied by an affidavit

executed by the owner of the information, which identifies the document

or part sought to be withheld, and which contains a statement of reasons

which addresses with specificity the items which will be considered by

,

the Commission as listed in subparagraph (b)(4) of Section 2.790.

The

information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in

this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be

.

pleased to discuss them with you.

-

Sincerely,

-

,

l0

-

. , ,

El

n J. Brunner, Chief

Reactor Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Inspection Report

Number 50-289/78-01

cc w/encls:

.

L. L. Lawyer, Manager, Generation Operations - Nuclear

G. P. Miller, Superintendent

J. P. O'Hanlon, Unit 1 Su::erintendent

R. W. Heward, Project Manager, GFUSC

Mis: Mary V. Southard, Chairman, Citi:: ens for a Safe Environment

(',lithout Repert)

$

14l?

062