ML19276H242
| ML19276H242 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/19/1978 |
| From: | Herbein J METROPOLITAN EDISON CO. |
| To: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML19276H238 | List: |
| References | |
| GQL-0959, GQL-959, NUDOCS 7910150868 | |
| Download: ML19276H242 (2) | |
Text
.
U/f2d!/2J Wll_,.
n a,,,,,,aa.,,,
9.ETROPOLITAN EDISON COMPANY
- .z w.
PCST CFFICE BOX 542 REAclNG, PENNSY LV ANI A 19603 TELEPHCNE 215 - 929-2601 May 19, 1973 GQ,L 0959 Mr. Z1 den J. 3rc.::er, Chief Reacter Operatic s & Nuclear Suppc-
- -a-h
'J.
S. 'inclear Regula r.ry Cc. issien 631 Park Avenue Ki=g cf Prf.ssia, Pennsylvania 19h06
Dear yr. 3rn :
er:
V" e Island !!uclear Statics, U=it 1 (CE-1)
- - - a Operating licesse :To. DPE-50 Decket No. 50-289 I:spectic: Report :70. 78-07 O
"of May 5,1978 cence: ing M. J. C. Eiggi=s' inspection of CC-1 and the his letter a d the attach =ent are in respc=se te your inspectic: letter resultant findi=g of c e apparent infractics.
Sincerely, 4:
J. G. Eerbein Vice President-Generatic:
JOH:EGM:ejg Att ach=e=0
.14l'/
002 7 91015o f56%
O Metropolitan Idisca Cc=pany Tnree Mile Island :Tuc'. ear Statien Unit I License :!c. DPE-50 Occhet :ic. 50-289 Inspection 7c. 78-07 Ac:arent Ite= of IIcnec=tliance Techneial Specificatien 6.3.1 states in part, " Written precedures and a'-*-istrative policies shall be established, i=ple=ented an
-='- ained..."
d Centra:/ to the above, at apprcxi=ately 2:00 p.:. on April 15, 1978, valve SA-V34 fas found shut when required by Inclosure III to Surveillance Procedure 1303-6.1, "Reacter Building Integrated leak Rate Test", Revision 6, d.sted March 1,1978 with TCII '(8-135, dated April 7,1978, to be open, thus provid-ing an i= proper barrier to conta*- ent leakage.
Restense to Ite= of :Tenec=eliance A.
Acticn Taken: A ces;1ete recheck Of the valve lineup was perfer:ed to assure that all valves were in the correct position for the Intes ated (IIET). An investigation was =ade te determine -iny the 9.
leak Rate Test va.lve position has been changed after the lineup
's =ade for the IIR2.
170 cause for the incorrect valve pcsitien was identified.
3.
Action to Prevent Recu-ence:
~'he ILET procedure vill be changed to require a briefing cf cperations persennel instructing thes net to cp-erste valves with IIRT tags without shift fora-a-approval.
C.
The precedure vill te changed by Septe=ber 1, 1978.
1419 003 e &