Forwards IE Insp Rept 50-289/78-03 & 30-12457/78-01 on 780226-0301 & Notice of Violation
ML19276H225
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/28/1978
From: Nelson P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Herbein J
METROPOLITAN EDISON CO.
Shared Package
ML19276H226 List:
References
NUDOCS 7910150851
Download: ML19276H225 (3)


See also: IR 05000289/1978003

Text

y

~ . ,

UNITED STATES

~,

. , S,

NUCLsAR R EG ULATORY COMMISSION

.

' d'

$

RECION 1

W.C#

2

sat PAnn AVENUE

U

xtNo or amuss: A. PENNSYLV ANI A 19406

'

.....

N 20im

Dockee Nos. 50-289

30-12457

Metropolitan Edison Company

ATTN: Mr. J. G. Herbein

Vice President

-

P. O. Box 542

Reading, Penhsylvania 19603

Gentlemen:

Subject:

Inspection 50-239/78-03 and 30-12457/78-01

This refers to the inspection conducted by Mr. K. Plumlee of this office

on February 26 - March 1,1978, and (offsite) March 9,1978, at the

Three Mile Island Nuclear Generating Station, Unit 1, Middletcwn,

Pennsylvania, of activities authorized by NRC License Nos. DPR-50 and

37-17257-01 and to the discussions of our findings held by Mr. Plumlee

with Mr. J. O'Hanlon and others of your staff at the conclusion of the

inspection, and to a subsequent telephone discussion between Mr. Plumlee

and Messrs. R. Dubiel and J. O'Hanlon on March 21, 1978.

.

'

Areas examined during' this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, measurements made by the inspector, and observations by the

inspector.

Our inspector also verified the steps you have taken to correct the

items of noncompliance brought to your attention in letters dated

October 20 and December 20, 1977.

We have no further questions regarding

your actions at this time with respect to the December 20, 1977 letter

and the steps you took to correct item B of the October 20, 1977 le+.ter.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with NRC requirements,

as set forth in the Notice of Violation, enclosed herewith as Aapendix

A.

These items of noncompliance have been categori:ed into the levels

1413

324-

.

7910150451

~

idetropolitan Edison Company

2

O

as described in our correspondence to you dated December 31, 1974

This

notice is sent to you pursuant to the provisions of Section 2.201 of the

NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office, within twenty (20)

days of your receipt of this notice, a written statement or explanation

,

in reply including:

(1) corrective steps which have been taken by you

-

and the results achieved; (2) corrective steps which will be taken to

avoid further items of noncompliance; and (3) the date when full compliance

wili be achieved.

With respect to Appendix A~, we note that you have corrected Item No. A,

.

and therefore you need not accress yourself to this matter in your

'

response.

'

I

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosures will be placed in the NRC's 'Public Document Room.

If this

report contains any information that you (or your contractor) believe to

'

be proprietary, it is necessary that you make a written application

within 20 days to this office to withhold such information from public

disclosure. Any such application must be accompanied by an affidavit

-

executed by the owner of the information, which identifies the document

or part sought to be withheld, and which contains a statement of reasons

which addresses with specificity the items which will be considered by

the Comission as listed in subparagraph (b)(4) of Sectien 2.790.

The

L

information sought to' be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in

this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

Sincerely,

A

JA

jW

g;

^

/

Paul R. Nelson, Chief

.

Fuel Facility and Materials Safety

Branch

Enclosures:

'.

Ap:endix A, Nctice of 'liolation

2.

Cf# ice of Inscection and Enforcement Instettien Recor: lumbers

50-25?/75-03 anc 3C-12457/73-01

g

1413

325

'te:ropolitan Edison Company

3

-

cc w/encls:

L. L. Lawyer, Manager, Generation Operations - fluclear

G. P. Miller, Superintendent

J. P. O'Hanlon, Unit 1 Superintendent

R. W. Heward, Project Manager, GPUSC

I. R. Finfrock, Jr.

Miss Mary V. Southard, Chairman, Citizens for a Safe Environment

(Without Report)

.