October 10, 2019 Mr. Scott Sharp Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota 1717 Wakonade Drive East Welch, MN 55089
SUBJECT:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 2 - CORRECTION LETTER FOR AMENDMENT NO. 216 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-60 (EPID L-2018-LLA-0147)
Dear Mr. Sharp:
On July 30, 2019, the U.S. Nuclear Regulatory Commission (NRC or the Commission) issued Amendment No. 228 to Renewed Facility Operating License No. DPR-42 and Amendment No. 216 to Renewed Facility Operating License No. DPR-60 for the Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2, respectively (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19140A447). The amendments revised the licenses for PINGP, Units 1 and 2, to modify the fire protection program. Specifically, the amendments deleted several modifications which are required as part of PINGPs implementation of its risk-informed, performance-based fire protection program in accordance with paragraph 50.48(c) of Title 10 of the Code of Federal Regulations, National Fire Protection Association Standard 805. Subsequently, the NRC staff issued corrections to that amendmet by letters dated August 24, 2019 (ADAMS Accession No. ML19225D217), and September 19, 2019 (ADAMS Accession No. ML19255H201).
This letter corrects the issuance of Amendment No. 216 for PINGP, Unit 2. This correction letter makes changes to the license that were not intended to be changed with the license amendment that are all administrative changes. The following administrative changes are being made from the correction letter issued September 19, 2019, to reflect existing license condition for both units, prior to the issuance of that correction letter because the amendment did not intend to change these conditions:
License condition 2.C.(4)(c) for PINPG, Unit 2:
o Change citation at the end of the condition 2.C.(4)(c)1. from 2.C.(v)(b)2 to 2.C.(4)(b)2.
o Add a comma after facility in condition 2.C.(4)(c)2.
License condition 2.C.(5) for PINGP, Unit 2, Additional Conditions o Change the amendment number 200 to 204
If you have any questions regarding this matter, please call me at (301) 415-3733.
Sincerely,
/RA/
Robert F. Kuntz, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-306
Enclosure:
Revised Renewed Facility Operating License Pages for Amendment No. 216 to DPR-60 cc: via Listserv
SUBJECT:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 - CORRECTION LETTER FOR AMENDMENT NOS. 228 AND 216 TO RENEWED FACILITY OPERATING LICENSE NOS. DPR-42 AND DPR-60 (EPID L-2018-LLA-0147) DATED OCTOBER 10, 2019 DISTRIBUTION:
PUBLIC RidsNrrDorlLpl3 Resource RidsNrrPMPrairieIsland Resource RidsNrrLASRohrer Resource RidsOgcRp Resource RidsACRS_MailCTR Resource RidsRgn3MailCenter Resource ADAMS Accession No.: ML19276F983 OFFICE DORL/LPL3/PM DORL/LPL3/LA DORL/LPL3/BC(A)
DORL/LPL3/PM NAME RKuntz SRohrer LRegner (RKuntz for)
RKuntz DATE 10/7/19 10/7/19 10/10/19 10/10/19 OFFICIAL RECORD COPY
NORTHERN STATES POWER COMPANY - MINNESOTA PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE DOCKET NO. 50-306 Amendment No. 216 License No. DPR-60
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Northern States Power Company, a Minnesota Corporation (NSPM, the licensee), dated May 18, 2018, as supplemented by letters dated July 10, 2018, December 6, 2018, and April 8, 2019, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to paragraphs 2.C(4) and 2.C(4)(c)2 of Renewed Facility Operating License No. DPR-60 is hereby amended as shown in the attached revised license pages.
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days.
FOR THE NUCLEAR REGULATORY COMMISSION Original signed by:
Lisa M. Regner, Acting Branch Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Renewed Facility Operating License Date of Issuance: July 30, 2019
ATTACHMENT TO LICENSE AMENDMENT NO 216 RENEWED FACILITY OPERATING LICENSE NO. DPR-60 PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 2 DOCKET NO. 50-306 Replace the following pages of the Renewed Facility Operating License No. DPR-60 with the attached corrected pages. The changed areas are identified by a marginal line.
REMOVE INSERT Page 6 Page 6 This License Condition does not apply to any demonstration of equivalency under Section 1.7 of NFPA 805.
- 2.
Fire Protection Program Changes that Have No More than Minimal Risk Impact Prior NRC review and approval are not required for changes to the licensees fire protection program that have been demonstrated to have no more than a minimal risk impact. The licensee may use its screening process as approved in the NRC safety evaluation dated August 8, 2017, to determine that certain fire protection program changes meet the minimal criterion. The licensee shall ensure that fire protection defense-in-depth and safety margins are maintained when changes are made to the fire protection program.
(c)
Transition License Conditions
- 1.
Before achieving full compliance with 10 CFR 50.48(c), as specified by 2. and 3. below, risk-informed changes to the licensees fire protection program may not be made without prior NRC review and approval unless the change has been demonstrated to have no more than a minimal risk impact, as described in 2.C.(4)(b)2.
- 2.
The licensee shall implement the modifications to its facility, as described in Attachment S, Table S-2, Plant Modifications Committed, in Northern States Power - Minnesota letter L-PI-18-005, dated May 18, 2018, to complete the transition to full compliance with 10 CFR 50.48(c), before the end of the second full operating cycle for each unit after approval of the NFPA 805 License Amendment dated August 8, 2017. The licensee shall maintain appropriate compensatory measures in place until completion of these modifications.
- 3.
The licensee shall implement the items listed in Attachment S, Table S-3, Implementation Items, of Northern States Power -
Minnesota letter L-PI-16-090, dated December 14, 2016, within 12 months after NRC approval, with the exception of Implementation Item 20, 66, and 70 which are associated with modifications and will be completed 180 days after modifications are complete.
(5) Additional Conditions The Additional Conditions contained in Appendix B, as revised through Amendment No. 204, are hereby incorporated into this license. NSPM shall operate the facility in accordance with the Additional Conditions.