ML19276F779
| ML19276F779 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 03/22/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Dail L DUKE POWER CO. |
| Shared Package | |
| ML19276F752 | List: |
| References | |
| NUDOCS 7904120091 | |
| Download: ML19276F779 (2) | |
See also: IR 05000413/1979004
Text
.
e G
UNITED STATES
g M00
NUCLEAR REGULATORY COMMISSION
og
,
REGloN 11
g
}e
g
101 M ARIETTA STREET. N.W.
.-
,r
8
ATLANTA. GEORGI A 30303
o
L
'
%**v /
MAR 2 21979
In Reply Refer To:
RII:PKV
50-413/79-04
50-414/79-04
Duke Power Company
ATTN:
L. C. Dail, Vice President
Design Engineering
P. O. Box 33189
Charlotte, N C 28242
Gentlemen:
This refers to the inspection conducted by P. K. VanDoorn of this office on
February 27 thru March 2, 1979, of activities authorized by h3C Construction
Permit Nos. CPPR-116 and CPPR-117 for the Catawba Nuclear Station, Units 1
and 2 facility, and to the discussion of our findings held with D. G. Beam at
the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with hTC requirements.
These items and references
to pertinent requirements are listed in the Notice of Violation enclosed
herewith as Appendix A.
This notice is sent to you pursuant to the provisions
of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations.
Section 2.201 requires you to submit to this office,
within 20 days of your receipt of this notice, a written statement or explanation
in reply including:
(1) corrective steps which have been taken by you and
the results achieved; (2) corrective steps which will be taken to avoid
further noncompliance; and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20
days to this office to withhold such information from public disclosure. Any
such application must include a full statement of the reasons on the basis of
which it is claimed that the information is proprietary, and should be prepared
so that proprietary information identified in the application is contained in
a separate part of the document.
If we do not hear from you in this regard
within the specified period, the report will be placed in the Public Document
Room'.
'i90412 607/
_
.
.
.
.
Duke Power Company
-2-
MAR 2 21979
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
/
-
Charles E. Murphy, C ief
Reactor Construction and Engineering
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-413/79-04,
and 50-414/79-04
cc w/ encl:
D. G. Beam, Project Manager
P. O. Box 223
Clover, S C 27910