ML19276F668

From kanterella
Jump to navigation Jump to search
Forwards LER 1-77-99
Date released: 10/17/2019 Download: ML19276F668


LER 1-77-99 on 771114:while Performing Reactor Pressure High Shutdown Cooling Isolation,Instrument B32-PS-N018A Did Not Actuate in Time.Caused by Flood Water Damage to Switch. Trouble Ticket Written & Instrument Replaced
ML19276F669
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 12/08/1977
From: Banks H
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19276F669 (2)
Forwards LER 1-77-99
ML19276F666
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 12/08/1977
From: Banks H
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19276F666 (1)