ML19276E586

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-327/78-41 on 781211,13-15 & Notice of Violation
ML19276E586
Person / Time
Site: Sequoyah 
Issue date: 01/05/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Niav Hughes
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19276E582 List:
References
NUDOCS 7903200023
Download: ML19276E586 (2)


See also: IR 05000327/1978041

Text

.

am Ricg

UNITED STATES

o

NUCLEAR REGULATORY COMMISSION

[

REGloN il

)

3.,,

g

5 .

- <

g

101 M A RIETT A sTRE ET. N.W.

~~f

ATL ANT A, GEORGI A 30303

o

\\.....*

JAN 0 51979

In Reply Refer To:

RII:PKV

50-327/78-41

Tennessee Valley Authority

ATTN:

Mr. N. B. liughes

Manager of Power

830 Power Building

Chattanooga, Tennessee 37401

Gentlemen:

This refers to the inspection conducted by Mr. P. K. VanDoorn of this office

on December 11, 1978, and December 13-15, 1978, of activities authorized by

NRC Construction Permit No. CPPR-72 for the Sequoyah Nuclear Plant Unit I

f acility, and to the discussion of our findings held with Mr. J. M. Ballentine

at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

Two new unresolved items resulted from this inspection and are discussed in

the enclosed report. These items will be examined during subsequent inspections.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. These items and references

to pertinent requirements are listed in the Notice of Violation enclosed

herewith as Appendix A.

This notice is sent to you pursuant to the provisions

of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations.

Section 2.201 requires you to submit to this office,

within 20 days of your receipt of this nctice, a written statement or expla-

nation in reply including:

(1) corrective steps which have been taken by you

and the results achieved; (2) corrective steps which will be taken to avoid

further noncompliance; and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20

days to this office to withhold such information from public disclosure. Any

such application must include 4. full statement of the reasons on the basis of

which it is claimed that the information is proprietary, and should be prepared

7903200 dM

.

JAN 0 51979

.

Tennessee Valley Authority

-2-

so that proprietary information identified in the application is contained in

a separate part of the document. If we do not hear from you in this regard

within the specified period, the report will be placed in the Public Document

Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

.

,-

Charles E.

f

ief

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-327/78-41

cc w/ encl:

Mr. J. E. Gilleland

Assistant Manager of Power

830 Power Building

Chattanooga, Tennessee 37401

Mr. G. G. Stack, Project Manager

Sequoyah Nuclear Plant

P. O. Box 2000

Daisy, Tennessee 37319

Mr. J. M. Ballentine

Plant Superintendent

Sequoyah Nuclear Plant

P. O. Box 2000

Daisy, Tennessee 37319

Mr. J. F. Cox

400 Commerce Street

W9D214

Knoxville, Tennessee 37302

t