Forwards Summary of Status of IE Bulletins Issued CY79,80 & 81,which Require Licensee Effort.Summary of Status of IE Bulletins 79-21, Temp Effects on Level Measurements, & 80-11, Masonry Wall Design, Will Be Provided
ML19275K809
Person / Time
Issue date: 02/24/1982
From: Baer R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Cox T
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Shared Package
ML19275K810 List:
References
REF-SSINS-6820, REF-SSINS-SSINS-6 NUDOCS 8203110505
Download: ML19275K809 (7)


Text

'

)

{TEIRU

\\

~

bo 0 O O SSINS NO.

4 FEB h TERA EIDLPT g

MEMORANDUM FOR: Thomas H. Cox 1' ' '/

'M' Regional Operations and Generic Requirements Staff

/

FROM:

Robert L. Baer, Chief

~

p

[

m Engineering and Technical Support Branch

' ?2.

SUBJECT:

IE ECLLETIN IMPACT ON LICENSEE BACKL6G

')

/

This memorandura is in response to your note of Februnry 2,1982 and the commitment made during the meeting of February 1,1982 in Mr. Jordan's office. As agreed upon during that meeting, Mr. Jordan and I reviewed all of the IE bulletins issued during calendar years 1979,1980 and 1981. We listed all of the bulletins that we judged may still require sufficient licensee effort ta be worth tabulation. The status of these bulletins are summari7ed in Table 1. with two exceptions. The exceptions are Bulletins 79-21, "Tegerature Effects on Level Measurements" and 80-11, " Masonry Wall Design." The most knowledge personnel regerding these bulletins were not available. We will provide you with e summary status of these two bMletins as soon as poss5ble.

Robert L. Caer, Chief Engineering & Technical Support Branch Division of Engineering and Quality Assurance, IE

Enclosure:

Table 1 cc:

E. Jordan W. Mills A. Dromerick J. Taylor

. ~., -.,

op p " e p

)E4 ab; MhD/W n,m,,, p 8203110505 820224 au ).

3/M/82 i

!E SSINS t 6820 CF m<c.o w :n,~ e w e c u. "

OFFICIAL RECORD COPY

  • "m =- am

e TABLE 1 STATUS OF PULLETIN5 No. of No. of Flants No. of Planned ulictin No.

Date Plants Complete as of Completions in

.ind Title of Issue Affected 12-31-01 FY U?

Remarks 79-02. Pipe Support 3/8/79 All newer reactors All Ol's have com-See Bulletin This bulletin ca"not be closed untti the lase Plates Using having a CP or OL.

pleted req'd analysis 79-14 Licensees complete t:1e work on 79-14 (the Concrete Expansion

& testing. However.

inchor Bolts required safety fac* ors necessitate having they have not achieved the loads fom *he piping).

reg'd safety factors.

Cp's are req'd to complete actions prior te DL.

19-13. Cracking in 10/16/79 All PWR's having M1 PWR's with OL's.

All nients in All Licensees and CP Holders have respondef.

reedwater Systm CP or OL.

This includes recent which feedwater This Bulletin requires continuation of piping OL's completing hot cracking has been ISI and repairs as necessary during the functional as of found have been short term. A PWR owners group has been Febwary 1982.

repaired.

formed to develop a lotg term solution to the problem. This will probably require design changes to the piping and nperating conditions and will have to be reviewed and approved by NRR ore a plant specific basis.

M44 Seismic 7/2/79 All power reactors Host OL's have com-Estimate 10 to 20 To obtain exact plant status on ?%02 and 3

W !ysis for having a CP or OL.

pleted reg'd analysis additional plants 79-14 would require a Regional Survey.

4 & llt Piping and have to comp!ete will be fully com-Estima te apstre. 10 plants to u?Iy

?yM m final support tWifi-plete in FY 82

complete, caties and u tve (See Remarks) weight verifications.

Corr'onwealth Edison &

TVA still have signi-ficant work to c'nplete en the operating plants.

CD's are reg'd to come plete acnons p:-tor to UL.

m.

y a

Page 2 TADLE 1 STATUS OF DULLETINS No. of

50. or plants No. of Planned Dulletin Mc.

Date Plants toiplete as of Completions in and Title of issue '

Affected 12-31-01 FY 82 Remarks 7015, Deep Draf t 7/9/79 All power reactors ~ 46-complete 29 We ere currently working with a con-Pump Deficiencies having a CP or OL.

29-open tractor to develop a set of minimum req 1rements for long term operability, An agreement was 4

made with Licensing Muen these are established it is that they would expected that several facilities will handie plants in OL be required to perform pump testing.

review in Licensing The facilitie*. requiring tests may not process.

have them completed in FY 82.

79-26. Boron loss 11/20/79 All operating BWR All Hone All applicable BWR operating license from BWR Control (Rev. I was plants; for BWRs holders have responded to the original Blades issued on under construction.

Bulletin and Revision. NRR is presently 8/29/80 to NRR is to include evaluating the reports. if additional change the requirements in requirements result from this evaluation, req'd sub-licensing process.

these would be referred to CRGR prior to mittal date imposition on licensees, for the metal-lurgical examin-ation report).

79-27, Loss of 11/30/79 All power reactors All plants have 10 plus.

Although all plants have responded to Non-Class IE with an OL &nd responded.

(See remarks) the bulletin, only the response from Instrumentation &

those plants 17 plants is clearly satisfactory.

-Control power nearing OL licensing.

There are about ten plants that still System Bus Durin?

had not completed all modifications Iscaration

(

as of about June 81). NRR and IE is currently considering whether to ask supplemental questions of the other licensees.

0

m-TABLE 1 Page 3 STATUS OF DULLETINS No. of No. of Plants No. of Planned ulletin No.

Date Plants Complete as of Completions in and Title _

o' 'ssue Affected 12-31-01 FY U2 Remarks 80-06. Engineering 3/13/80 All power reactors 52 (see rensrks) 17 (see remarks)

NRR reviews the individual licensee Safety Features having an OL.

respondes, then writes on SER.

(EST) Reset Controls Fifty-two SER's have been prepared, with the remaining 17 scheduled for completion in FY 82.

The regional of ficcs are tracking the completion of licensee cornitments.

80-07. BWR Jet Pump 4/4/00 All BWR-3 & BWR-4 A11 plants have Deper.ds on results Plants perform an ISI and Jet Pump Beam Failure plants having an OL.

c;apleted first of Inservice Inspection Operability Surveillance during round inspections (151) perforned during each refueling outage. Defective and replacement, each refueling outage, beams are replaced. Long term as necessary.

(see remarks) resolution as stated in the following potential issues that would be reviewed by the CRGR prior to implementatien:

1.

Backfitting of plants with new improved beam-plans and schedules for systematic changeout.

2.

Necessity for continuation of ASME Code 151 intervals for new improved beam installation in BWR's 3, 4. 580, 3.

Whether continuation of Jet Pump Operability Surveillance (i.e.,

frequency, parameter checks, etc.)

can be relaxed - changed tn its-frequent interval - and/or need to be a Tech spec requirmvent.

e e

j TABLE 1 "0'! 4 STMU5 0F DVLLETINS No. of No. of Plants No. of Planned Dulletin No.

Date Plants Complete as of Completions in and Tf tle of Issue Affected 12-31-01 FY P2 Remarks 80-08. Examination 4/7/80 All power reactors All Nine All applicable if censees dSi CP of Contafruwnt Liner having a CP or OL.

holders have responded to the Penetration Welds bulletin. Parameter Inc. is work h; on bulletin closecut. There are two issues that may, in the future lead to addittor.a1 requirements. These would be referred to the CRGR before implementing new requirements. The two issues are (1) 17 plants were not required to perform en inspection during construction of cont &inment penetrations (flued head fittings) on piping and (2) the ASME code does not currently require ISI of the welds in these penetrations.

80-13. Cracking in 5/12/B0 All DWR plants All Number depends on All licensees have responded; this Core Spray Spirgers having an OL.

further Inservice bulletin requires continuation of ISI Inspection (ISI) and repairs as necessary untti new results. Gee remarks) spargers, incorporating materials resistent to Intergranular Stress Corrosion Cracking Failures, are installed. At the present time th(se plants with cracked spargars (Pilgrim, Oyster Creek) have chosen to repair, rather than replaced, subject to NRR approval of repairs.

e e

TABLE 1 Page 5 STATUS OF DULLETINS No. of No. of Plants ho. of Planned Dv11etin No.

Date Plants Complete as Of Completions in 3

j _and Title of Issue A f fected 12-31-81 FY E2 Remarks

.80 % Potential 6/27/80 All power reactors 95 Total 70 (see remarks)

All applicable ifcensees and CP Mmpplica tion having a CP or OL.

53 No Rosemount holders have responded to the bulletin.

mf Rosemt Transmitter Parameter Inc. is working on the Pressure Trans.

32 No action bulletin. 70 responses indicate that mitters required corrective action will be taken or 10 cancelled further investigation is in progress.

t 180-21. Val w 11/6/80 All power reactors All plants have Approximately 7 The bulletin responses identified l Yokes Supp1 fed having a CP or OL.

resoonded.

(see remarks) seven plants having defective yokes.

by Malcolm The bulletin did not requite i supple-Foundry Co., Inc.

mantal response to indicate completion of repairs however, the seven plants J

are being tracked by the Regional Offices Parameter Inc. is working on bulletin closecut.

80-25, Operating 12/19/80 All operating.4*d All None All applicable licensees have responded; Problem with NTOL BWR plants;

' Target pack however, there is sM ii a potential

! Safety-Peller.

for BWRs under generic problem wittr setpoint drift in construction, NRR the two-stage Target Ptek SRV. If

, Valves at ttWRs is to include additional requirements are necessary, l

requirements.

these would be referred to CRGR prior to imposition.on licensees.

81-01, Survelliance 1/26/81 revised All power reactors 52 29 of Mechanical 3/4/81 to change having an OL plus Snubbers the affected CP six NT0ls plants

TABLE I Page 6 STATUS OF DULLETINS No. of No. of Plants No. of Planned 3u11etin No.

Date Plants Complete as of Completions in and Title of Issue Affec ted 12-31-01 FY 82 Remarks 81-02. Failure of 4/9/81 All plants having All plants havs All modifications not The bulletin responses indicated Gate Type Valves a CP or OL.

res ponded.

yet made should be that 47 plants are potentially to Close Against completed in FY 82.

affected. Since the bulletin did Dif ferential (see remarks) not require a supplental response Pressure when modifications were templeted.

the Regional Offices are tracking the affected plants. Pa rameter' Inc.

11 working on closeout.

81-02. Sup-8/18/81 All plants having All plants have All modifications not fhe bulletin responses ind*cated piement 1.

a CP or OL.

res ponded.

yet made should be that 16 plants are potentially Failure of Gate completed in FY 82, affected. Since the bulletin did Type Valves to (see.-emarks).

not require a supplemental response r Close Against when modifications were completed.

Differential the Regional Offices are tracking Pressure the affected plants.

51-03. Flow 4/10/81 All plants having All plants are See remarks Parameter Inc. is working on ci;se-Blockage of a CP or OL.

to have responded out. Actions committed to in the Cooling Water by this date.

bulletin responses will extend f,or to Safety Related the life of the plant.

Components by CORDICULA SP.

IAsiaticClam) and MYTILUS SP.

(Mussel)

.