| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 09/04/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19275A732 | List: |
| References | |
| NUDOCS 7910190058 | |
| Download: ML19275A737 (2) | |
See also: IR 05000327/1979043
Text
/
'
o
UNITED STATES
-
!
NUCLEAR REGULATORY COMMISSION
n
$
nE
REGION 11
'#
o
101 M4 R:ETTA sT
N.W., sulTE 310o
.
o
ATLANTA, GEORGIA 30303
.....
SEP 0 41979
In Reply Refer To:
RII:MJG
50-327/79-43
50-328/79-24
Tennessee Valley Authority
Attn:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, Tennessee 37401
Gentlemen:
This refers to the inspection conducted by M. J. Gouge of this office on
August 13-16, 1979 of activities authorized by NRC Construction Permit
Nos. CPPR-72 and CPPR-73 for the Sequoyah Nuclear Plant facility, Unit
Nos. I and 2, and to the discussion of our finlings held with D. W. Pack
at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements. This item
and references to pertinent requirements are listed in the Notice of
Violation enclosed herewith as Appendix A.
This notice is sent
' you
pursuant to the provisions of Section 2.201 of the NRC's " Rule vf
Practice", Part 2, Title 10, Code of Federal Regulations.
Section 2.201
requires you to submit to this office, within 20 days of your receipt of
this notice, a written statement or explanation in reply including:
(1)
corrective steps which have been taken by you, and the results achieved;
(2) corrective steps which will be taken to avoid further noncompliance;
and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractor)
believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such information
from public disclosure. Any such application must include a full statement
of the reasons on the basis of which it is claimed that the information
is proprietary, and should be prepared so that proprietary information
1179 089
0*
7D10190
_
_._._
.
.
SEP 0 41979
Tennessee Valley Authority
-2-
.
identified in the application is contained in a separate part of the
document.
If we do not hear from you in this regard within the specified
period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
C. E. Mu
,
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-327/79-43
and 50-328/79-24
cc w/ enclosures:
G. G. Stack, Project Manager
Post Office Box 2000
Daisy, Tennessee 37319
J. M. Ballentine
Plant Superintendent
Post Office Box 2000
Daisy, Tennessee 37319
J. F. Cox
400 Commerce Street
W10C131 C
Knoxville, Tennessee 37902
D. L. Lambert, Project Engineer
400 Chestnut Street Tower II
Chattanooga, Tennessee 37401
1179 090