Forwards IE Insp Repts 50-338/79-33 & 50-339/79-43 on 790723-0810.No Noncompliance Noted
ML19275A725
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 08/30/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Proffitt W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML19275A726 List:
References
NUDOCS 7910190030
Download: ML19275A725 (2)


See also: IR 05000338/1979033

Text

s'

'

, , , -

[

K.L

.

'o

UNITED STATES

8

NUCLEAR REGULATORY COMMISSION

987

o

'

e e

REGION 11

s

o

101 MARIETTA ST., N.W.. SUITE 31oJ

o

ATLANTA, GEORGIA 3o3o3

.....

In Rooly Refer T.

AUb 3 V 1370

,

.

RII:MSK

'

50-338/79

J.,

50-339/7P ?S

Virginia Electric and Power Company

Atta:

W. L. Proffitt

Senior V:ce President, Power

Post Office Box 26666

'

Richmond, Virginia 23261

Gentlemen:

This refers to the inspection conducted by M. S. Kidd of this office on

July 23 through August lu,1979 of activities authorized by NRC License

No. NPF-4 and Construction Permit No. CPPR-78 for the North Anna Nuclear

Plant facility, Unit Nos. I and 2, and to the discussion of our findings

held with J. D. Kellams and other members of your staff periodically

during the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

We have examined actions you have taken with regard to previously identi-

fied enforcement matters and unresolved items. The status of these

items is discuss-d in the enclosed report.

One new unresolved item resulted from this inspection and is discussed

in the enclosed report. This item will be examined during subsequent

inspections.

In accordance with Sectior 2.790 of the NRC's "Rc.'.es of Practice",

Part 2, Title 10, Code of Federal Regulations, a r.opy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information thzt you (or

your contractor) believe t: be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed hat the information is proprietary, and should be prepared so

1179

038

D E

,

7910190

f

.

Virginia Electric and

-

,3 , g g

Power Company

-2-

that proprietary information identified in the application is contaided

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

/

$

'

n

R. C. Lewis, Acting Chief

Reactor Operations and

Nuclear Support Branch

Enclosures:

Inspection Report Nos. 50-338/79-33

and 50-339/79-43

cc w/ enclosures:

W. R. Cartwright, Station Manager

Bo:: 402

Mineral, Virginia 23117

P. G. Perry

Senior Resident Engineer

Post Office Box 38

Mineral, Virginia 23117

'

1179