ML19275A675
| ML19275A675 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 09/04/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Dail L DUKE POWER CO. |
| Shared Package | |
| ML19275A673 | List: |
| References | |
| NUDOCS 7910180104 | |
| Download: ML19275A675 (2) | |
See also: IR 05000413/1979015
Text
-
jo
UNITED STATES
8
NUCLEAR REGULATORY COMMISSION
o
.
g
a a
REGION 11
o,
f
101 MARIETTA ST., N.W., SUITE 3100
[
ATLANTA, G EoRGIA 3o3o3
In Reply Refer To:
RII:CRM
erp 0 41979
50-413/79-15
'
50-414/79-15
Duke Power Company
Atta:
L. C. Dail, Vice President
Design Engineering
Post Office Box 33189
Charlotte, North Carolina 28242
Gentlemen:
This refers to the inspection conducted by C. R. McFarland of this
office on August 21-24, 1979 of activities authorized by NRC Construction
Permit Nos. CPPR-116 and CPPR-117 for the Catawba facility, and to the
discussion of our findings held with R. L. Dick at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report.
Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
1184
346
1
~910180 h
'
.
.
Duke Power Company
-2-
S A f 19 3
,
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
C. E. Murph 6 e
Reactor Construction and
Engineering Support Branch
Enclosures:
Inspection Report Nos. 50-413/79-15
and 50-414/79-15
cc w/ enclosures:
D. G. Beam, Project Manager
Post Office Box 223
Clover, South Carolina 29710
.
1184
347
9