ML19275A646
| ML19275A646 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 08/31/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML19275A643 | List: |
| References | |
| NUDOCS 7910180054 | |
| Download: ML19275A646 (2) | |
See also: IR 05000321/1979026
Text
.
/
UNITED STATES
o
8
NUCLEAR REGULATORY COMMISSION
o
e
REGION 11
g
a'#
101 MARIETTA ST., N.W.. SUITE 3100
\\.....
ATLANTA, GEORGIA 30303
AUG 311979
In Reply Refer To:
RII:EJV
50-321/79-26
50-366/79-30
Georgia Power Company
ATTN:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
This refers to the inspec tion conducted by E. J. Vallish of this office on
August 15-17, 1979, of activities authorized by NRC Operating License No. DPR-57
and License No. NFP-5 for t'he Hatch facility, and to the discussion of our
findings held with T. V. Green at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
'
,
Charles E. Murp y,
ief
Reactor Construction and Engineering
Support Branch
Enclosure:
See Page 2
1184
275
Y
791018o 058
~~' }
.~7; ~
-
,
,+
.
AUG 311979
Georgia Power Company
-2-
.
Enclosure:
Inspection Report Nos. 50-321/79-26
and 50-366/79-30
cc w/ enc 1:
M. Manry, Plant Manager
P. O. Box 442
Baxley, GA 31513
C. E. Belflower
Site QA Supervisor
P. O. Box 442
Baxley, GA 31513
1184 276