ML19275A642
| ML19275A642 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 09/17/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML19275A643 | List: |
| References | |
| NUDOCS 7910180049 | |
| Download: ML19275A642 (1) | |
Text
'
f.y>
=
pen C
' *i?
s-UNITFD ST ATTE
,[
5, (,'..,Y ' I
'1 i3 NUCL L AH RE GUL A IOhY COM'.".lSSION O
~-
n E Gt0 N II 5'
,,. ;Lr, I U '.1 A M U 1 A M C./
%IM '190 A T I. r '4 T A. G ' 1 RG I A 3 ". *01 SEP 1 ' 1979 In Reply Refer To:
RII.EJV 50-321/79-27 50-366/79-31 Georgia Power Conpany Attn:
J. H. Miller, Jr.
Executive Vice President 270 Peachtree Street Atlanta, Georgia 30303 Gentlenen:
Reference is made to my letter of August 3, 1979, transmitting a report for an inspection made on August 15-17, 1979.
Incorrect inspection numbers were assigned to this report.
The correct nunbers are 50-321/79-27 and 50-366/79-31.
Please replace the original letter and report cover page with the enclosures.
Sincerely, f/zd, y/ pn/,
r
,s L 9 Charles E. Murphy, Chief Peactor Construction and Engitteering Support Branch Fncioneres:
1.
Corrected copy of letter dated August 31, 1979 2.
Corrected cover sheet ta Peport Ls.
50-321/79-2 7 and 50-366/79-31 cc:
M. Manry, Plant Manager Post Office Box 442 Baxley, Geor;*ia 31513 C. E. Belflower Site QA Supervisor Post Office Box 442 Baxley, Georgia 31513 W. A. Widnar Manager-Nuclear Operations Georgia Powe r Co:tpany Post Office Box 4545 1181 274 Atlanta, Georgia 30303 791018 0 C Vf