Forwards Revised Pages Correcting Insp Numbers for Insp Rept Transmitted 790803
ML19275A642
Person / Time
Site: Hatch  
Issue date: 09/17/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19275A643 List:
References
NUDOCS 7910180049
Download: ML19275A642 (1)


Text

'

f.y>

=

pen C

' *i?

s-UNITFD ST ATTE

,[

5, (,'..,Y ' I

'1 i3 NUCL L AH RE GUL A IOhY COM'.".lSSION O

~-

n E Gt0 N II 5'

,,. ;Lr, I U '.1 A M U 1 A M C./

%IM '190 A T I. r '4 T A. G ' 1 RG I A 3 ". *01 SEP 1 ' 1979 In Reply Refer To:

RII.EJV 50-321/79-27 50-366/79-31 Georgia Power Conpany Attn:

J. H. Miller, Jr.

Executive Vice President 270 Peachtree Street Atlanta, Georgia 30303 Gentlenen:

Reference is made to my letter of August 3, 1979, transmitting a report for an inspection made on August 15-17, 1979.

Incorrect inspection numbers were assigned to this report.

The correct nunbers are 50-321/79-27 and 50-366/79-31.

Please replace the original letter and report cover page with the enclosures.

Sincerely, f/zd, y/ pn/,

r

,s L 9 Charles E. Murphy, Chief Peactor Construction and Engitteering Support Branch Fncioneres:

1.

Corrected copy of letter dated August 31, 1979 2.

Corrected cover sheet ta Peport Ls.

50-321/79-2 7 and 50-366/79-31 cc:

M. Manry, Plant Manager Post Office Box 442 Baxley, Geor;*ia 31513 C. E. Belflower Site QA Supervisor Post Office Box 442 Baxley, Georgia 31513 W. A. Widnar Manager-Nuclear Operations Georgia Powe r Co:tpany Post Office Box 4545 1181 274 Atlanta, Georgia 30303 791018 0 C Vf