ML19275A288

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-508/79-06 & 50-509/79-05 on 790709-12.No Noncompliance Noted
ML19275A288
Person / Time
Site: Satsop
Issue date: 08/10/1979
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Strand N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML19275A289 List:
References
NUDOCS 7910030734
Download: ML19275A288 (2)


See also: IR 05000508/1979006

Text

t

y

(,,

  1. p nucq,Io,

'

UNITED s TATEs

8\\

%

NUCLEAR REGULATORY COMMISSION

$ . ' ',"

nE

REGION V

,,

19Tl N. CA. IFORNI A DOULEVARD

oi

g

g

SL ITE 202, WALNUT CREEK PL AZA

% ,,,* e

+

WALNUT CREEK CALIFORNIA 94596

August 10, 1979

Docket Nos. 50-508

50-509

Washington Public Power Supply System

-

P. O. Box 468

Richland, Washington 9935%

Attention: Mr. N. O. Strand

Managing Director

-

Gentlemen:

Subject:

NRC Inspection - WNP 3 and 5

This refers to the inspection conducted by Messrs. D. F. Kirsch, T. W. Hutson

and G. Hernandez of this office on July 9-12, 1979 of activities authorized

by NRC Construction Permit Nos. CPPR-154 and CPPR-155, and to the discussion

of our findings held by Mr. Kirsch with Mr. C. E. Love and other members

of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, inter-

views with personnel, and observations by the inspectors.

No items of no1 compliance with NRC requirements were identified within

the scope of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2 Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you believe

to be proprietary, it is necessary that you submit a written application

to this office, within 20 days of the date of this letter, requesting

that such information be withheld from public disclosure.

The applica-

tion must include a full statement of the reasons why it is claimed that

the information is proprietary. The application should be prepared so

that any proprietary information identified is contained in an enclosure'

1C)2 002

q9100307%

.

.

Washington Public Power Supply System

-2-

August 10, 1979

to the application, since the application without the enclosure will

also be placed in the Public Document Room.

If we do not hear from you

in this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely,

jlklp,w~

G. S. Spencer, Chief

Reactor Construction and

Engineering Support Branch

.

Enclosure:

IE Inspection Report

Nos. 50-508/79-06

.

50-509/79-05

cc w/o enclosure:

M. E. Witherspoon, Division Manager

Quality Assurance, WPPSS

cc w/ enclosure:

W. J. Talbott, Divisinn Manager, WPPSS

,

1C72

003