ML19275A288
| ML19275A288 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 08/10/1979 |
| From: | Spencer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Strand N WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML19275A289 | List: |
| References | |
| NUDOCS 7910030734 | |
| Download: ML19275A288 (2) | |
See also: IR 05000508/1979006
Text
t
y
(,,
- p nucq,Io,
'
UNITED s TATEs
8\\
%
NUCLEAR REGULATORY COMMISSION
$ . ' ',"
nE
REGION V
,,
19Tl N. CA. IFORNI A DOULEVARD
oi
g
g
SL ITE 202, WALNUT CREEK PL AZA
% ,,,* e
+
WALNUT CREEK CALIFORNIA 94596
August 10, 1979
Docket Nos. 50-508
50-509
Washington Public Power Supply System
-
P. O. Box 468
Richland, Washington 9935%
Attention: Mr. N. O. Strand
Managing Director
-
Gentlemen:
Subject:
NRC Inspection - WNP 3 and 5
This refers to the inspection conducted by Messrs. D. F. Kirsch, T. W. Hutson
and G. Hernandez of this office on July 9-12, 1979 of activities authorized
by NRC Construction Permit Nos. CPPR-154 and CPPR-155, and to the discussion
of our findings held by Mr. Kirsch with Mr. C. E. Love and other members
of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, inter-
views with personnel, and observations by the inspectors.
No items of no1 compliance with NRC requirements were identified within
the scope of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2 Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you believe
to be proprietary, it is necessary that you submit a written application
to this office, within 20 days of the date of this letter, requesting
that such information be withheld from public disclosure.
The applica-
tion must include a full statement of the reasons why it is claimed that
the information is proprietary. The application should be prepared so
that any proprietary information identified is contained in an enclosure'
1C)2 002
q9100307%
.
.
Washington Public Power Supply System
-2-
August 10, 1979
to the application, since the application without the enclosure will
also be placed in the Public Document Room.
If we do not hear from you
in this regard within the specified period, the report will be placed in
the Public Document Room.
Should you have any questions concerning this inspection, we will be
glad to discuss them with you.
Sincerely,
jlklp,w~
G. S. Spencer, Chief
Reactor Construction and
Engineering Support Branch
.
Enclosure:
IE Inspection Report
Nos. 50-508/79-06
.
50-509/79-05
cc w/o enclosure:
M. E. Witherspoon, Division Manager
Quality Assurance, WPPSS
cc w/ enclosure:
W. J. Talbott, Divisinn Manager, WPPSS
,
1C72
003