ML19274G007

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-413/79-13 & 50-414/79-13 on 790627-29.No Noncompliance Noted
ML19274G007
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 07/20/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
Shared Package
ML19274G005 List:
References
NUDOCS 7908270309
Download: ML19274G007 (2)


See also: IR 05000413/1979013

Text

e

t>RRfGo

a

'o

UNITED STATES

,

2 q/-[' 8

._ f

'n

NUCLEAR REGULATORY COMMISSION

!\\

5c'

S

REGION 11

101 MARIETTA sT., N.W., SUITE 3100

o,

8

ATLANTA, GEORGI A 30303

g xc j

  • ....

In Reply Refer To:

JUL 2 01979

RII:PhT

50-413/79-13

50-414/79-13

Duke Power Company

Attn:

L. C. Dail, Vice President

Design Engineering

Post Office Box 33189

Charlotte, North Carolina 28242

Gentlemen:

This refers to the inspection conducted by P. K. Van Doorn of this

office on June 27-29, 1979 of activities authorized by NRC Construction

Permit Nos. CPPR-116 and CPPR-117 for the Catawba Nuclear Plant facility,

Units 1 and 2, and to the discussion of our findings held with D. L. Freeze

at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Pub,lic

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the infermation is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

.

790827g30 p

P

'

.

.

JUL 2 019/9

Duke Power Company

-2-

-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

' ' . "

'

C. E. Murphy,

ief

Reactor Construction and

Engineering Support Branch

Enclosures:

Inspection Report Nos. 50-413/79-13

and 50-414/79-13

cc w/ enclosures:

D. G. Beam, Project Manager

Post Office Box 223

Clover, South Carolina 29710