ML19274F885

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-321/79-13 & 50-366/79-17 on 790514-18.Notice of Violation Withheld (Ref 10CFR2.790)
ML19274F885
Person / Time
Site: Hatch  
Issue date: 06/11/1979
From: Kenna W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19063C947 List:
References
NUDOCS 7908210316
Download: ML19274F885 (2)


See also: IR 05000321/1979013

Text

-

MUERIALTRANS!?!TTED HEREWITH

C0HTAIMS 2.753 IXi3R;l.AT13N

.

e"<cg

UNITED STATES

8[

fo

+

g

NUCLEAR REGULATORY COMMISSION

s,

o

,

'E

REGION 11

$

101 MARIETT A sT., N.W., SUITE 3100

e[

0,

ATLANTA, G EORGI A 3o3o3

% * *As

o

..+

JVN 111979

In Reply Refer To:

RII: CDP

50-321/79-13

50-366/79-17

.

Georgia Power Company

ATI'N:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

This refers to the inspection conducted by C. D. Perny of this office on

May 14-18, 1979, of activities authorized by NRC Operating License Nos. DPR-57

and NPF-5 at Hatch I and 2 and to the discussion of our findings held with

C. T. Moore at the conclusion of the inspection.

The area examined during this inspection was your program for safeguarding

special nuclear material under the applicable provisions of Title 10, Code of

Federal Regulations, Part 73, " Physical Protection of Plants and Materials."

Within this area, the inspection consisted of selective examinations of pro-

cedures and representative records, interviews with personnel, and observations

by the inspector.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed here-

with as Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations.

Section 2.201 requires you to submit to this office, within 20

days of your receipt of this notice, a written statement or explanation in reply

including:

(1) corrective steps whict have been taken by you and the results

achieved; (2) corrective steps which will be taken to avoid further noncompli-

ance; and (3) the date when full compliance will be achieved. Details of

activities involving safeguards and se.urity measures are exempt from disclosure

in accordance with 10 CFR 2.790(d). T;ierefore, your response should be incor-

porated in a separate paper and referenced in your reply.

In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2,

Titie 10, Code of Federal Regulations, activities involving safeguards and

scarity measures are exempt from public disclosure; therefore, the enclosures

to this letter with the exception of the report cover page, which is an inspec-

tion summary, will not be placed in the Public Document Room.

2005 075

oca

na#

my

uyllP

79082103/6

90

nmRmTRwmmmmTa

bNk

CONI Am5 2X3 i:;i3:,...All3N

. . . - . . . -

. . . . - . .

.

.

h'ATERIAL TRU S"lTTED HEREWITH

CONTAINS 2.7% INFOR!!ATION.

'

'

Georgia Power Company

-2-

A N 111979

.

Should you have any questions coricerning this letter, we will be glad to discuss

them with you.

Sincerely,

k.

/

m

,

. B. EA

, Chief

Safeguard Branch

Enclosures:

1.

Appendix A, Notice of Violation

(Exempt from Disclosure)

2.

Inspection Report Nos. 50-321/79-13

and 50-366/79-17

(Exempt from Disclosure)

3.

Inspection Sumary

(Not Exempt)

cc w/ enc 1:

M. Hanry, Plant Manager

P. O. Box 442

Baxley, GA 31513

C. E. Belflower

Site QA Supervisor

P. 3 Box 442

Bexley, GA 31513

.

2005

076

f lb,.

..

~

n'ATEE',t. TilNP"TTED !! TITH

^ ^ "i

-

-

00!aA!::: 2.70 liJCrJJail;N