ML19274E773

From kanterella
Jump to navigation Jump to search
Forwards LER 79-028/03L-0
Date released: 10/15/2019 Download: ML19274E773


LER 79-028/03L-0 on 790321:while Performing Emergency Feedwater Sys Demonstration,Discovered Pump Discharge Pressure Gauge EF-2-PI Inoperable.Caused by Failed Pressure Gauge.Gauge Replaced
ML19274E774
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/10/1979
From: Cooper J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19274E774 (2)
Forwards LER 79-028/03L-0
ML19274E772
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/16/1979
From: Stewart W
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19274E772 (1)