ML19274E739

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-566/79-03 & 50-567/79-03 on 790213-15.No Noncompliance Noted
ML19274E739
Person / Time
Site: Yellow Creek  
Issue date: 03/15/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19274E740 List:
References
NUDOCS 7904240229
Download: ML19274E739 (2)


See also: IR 05000566/1979003

Text

sosa

ehy

UNITED STATES

  1. p >R MOOg

\\

t

o

NUCLEAR REGULATORY COMMISSION

g

es

REGloN ll

u

0

-

E

101 MARIETTA STREET,N.W.

ATLANTA, GEORGI A 30303

o,

s*****/

NAR 151979

In Reply Refer To:

RII:EJV

50-566/79-03

50-567/79-03

Tennessee Valley Authority

Attn:

Mr.11. G. Parris

Mar.ager of Power

500A Chestnut Street Tower II

Chattanooga, Tennessee 37401

Gentlemen:

This refers to the inspection conducted by Mr. E. J. Vallish of this office

on February 13-15, 1979, of activities authorized by NRC Construction Permit

Nos. CPPR-172 and CPPR-173 for the Yellow Creek Nuclear Plant Unit I and 2

facilities, and to the discussion of our findings held with Mr. L. S. Cox at

the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within

20 days to this office to withhold such infomation from public disclosure.

Any such application must include a full statement of the reasons on the

basis of which it is claimed that the information is proprietary, and should

be prepared so that proprietary information identified in the application is

contained in a separate part of the document.

If we do not hear from you in

this regard within the specified period, the report will be placed in the

Public Document Room.

$ GDyg

.

MAR 151979

\\

Tennessee Valley Authority

-2-

Should you have any questions concerning this letter, we will be glad to

dincuss them with you.

Sincerely,

.f}'

-

C. E. Murphy, C1 ef

Reactor Construction and Engineering

Support Branch

Enclosure:

Inspection Report Nos. 50-566/79-03

and 50-567/79-03

cc w/ encl:

Mr. J. F. Cox

400 Commerce Street

W10C131 C

Knoxville, Tennessee 37902

Mr. M. M. Price, Project Manager

Yellow Creek Nuclear Plant

P. O. Box 2000

Iuka, Mississippi 38852

Mr. D. L. Terrill

Project Engineer

400 Chestnut Street, Towc' II

Chattanooga, Tennessee 3 01