ML19274E571
| ML19274E571 | |
| Person / Time | |
|---|---|
| Site: | 07000036 |
| Issue date: | 02/28/1979 |
| From: | Davis A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Lichtenberger H ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY |
| Shared Package | |
| ML19274E572 | List: |
| References | |
| NUDOCS 7904090201 | |
| Download: ML19274E571 (2) | |
Text
T 5
cfp arc %,
UNITED STATES 4
NUCLEAR REGULATORY COMMISSION 4
., of h
REGION lll y2 799 ROOSEVELT ROAD
%,. v 4 8 GLEN E LLYN, ILLINolS 60137 TEB. 2E 1979 Docket No. 70-36 Combustion Engineering, Inc.
ATTN:
Mr. H. V. Lichtenberger Vice President - Manufacturing Nuclear Power Systems Windsor, CT 06095 Gentlemen:
This refers to the inspection conducted by Mr. C. C. Peck of this office on February T2-16, 1979, of activities at Hematite, Missouri authorized by NRC Special Nuclear Material License No. SNM-33 and to the discussion of our findings with Mr. J. A. Rode and members of his staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personnel.
No items of noncompliance with h7C requirements were identified during the course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room, except as follows.
If this report contains information that you or your contractors believe to be proprietary, you must apply in writing to this office, within twenty days of your receipt of this letter, to withhold such information from public disclosure. The application must include a full statement of the reasons for which the informate;.. is con-sidered proprietary, and should be prepared so that pr.cceletary information identified in the application is containtd in an enclosure to the application.
790409020l"
Combustion Engineering, IfR 2E t97)
Inc.
We will gladly discuss any questions you have concerning this inspection.
Sincerely, M
A. B. Davis, Chief Fuel Facility and Materials Safety Branch
Enclosure:
IE Inspection Report No. 70-36/7,9-02 cc w/ encl:
Mr. J. A. Rode, Plant Manager Central Files Reproduction Unit NRC 20b PDR NSIC d
'o a
,