ML19274D730

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-341/78-18 on 781113-17 & Notice of Violation
ML19274D730
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/03/1979
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
Shared Package
ML19274D731 List:
References
NUDOCS 7902220239
Download: ML19274D730 (2)


See also: IR 05000341/1978018

Text

T

r

8

4

UNITED STATES

E

/.

NUCLEAR REGULATORY COMMISSION

,,

j t.{g,1Tf j

REGloN ill

g'(

.

-C

799 ROOSE vt t T RO A:

y sc./ g

c tt t e t s % it t a._

.

"

O

,.

....*

.

.

N -

Docket No. 50-341

Detroit Edison Company

AiTN:

Mr. Edward Hines

Assistant Vice President

and Manager Quality

Assurance

2000 Second Avenue

Detroit, MI 48226

Gentlemen:

This refers to the inspection conducted by Messrs. H. S. Phillips,

C. M. Erb, K. R. Naidu and H. M. Wescott of this office on

November 13-17, 1978, of activities at Fermi 2 authorized by NRC

Construction Permit No. CPPR-87 and to the discussion of our

findings with you, Messrs. Fahrner, Ryan and Walker, and others of

the Fermi 2 project staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

examined durir.g the inspection. Within these areas, the

inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with

personnel.

During this inspection, certain of your activities appeared

to be in noncompliance with NRC requirements, as described

in the enclosed Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code

of Federal Regulations.

Section 2.201 requires you to submit to

this office within thirty days of your receipt of this notice a

written statement or explanation in reply, including for each

item of noncompliance: (1) corrective action taken and the results

achieved; (2) corrective action to be taken to avoid further non-

compliance; and (3) the date when full compliance will be achieved.

7902220A39

e-

e

,

Detroit Edison Company

-2-

~

.

~~

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of rederal Regulations, a copy of this

letter, the enclosures, and your response to this letter will be

placed in the NRC's Public Document Room, except as follows.

If

the enclosures contain information that you or your contractors

believe to be proprietary, you must apply in writing to this office,

within twenty days of your receipt of this letter, to withhold such

information from public disclosure. The application must include a

full statement of the reasons for which the information is considered

proprietary, and should be prepared so that proprietary information

identified in the application is contained in an enclosure to the

application.

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

J

_ - _ s/'

,

--

. F. Heishman, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A Notice

of Violation

2.

IE Inspection Report

No. 50-341/78-18

cc w/encls:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Rotiald Callen, Michigan Public

Service Commission

Eugene B. Thomas, Jr.,

Attorney

s