ML19274D407

From kanterella
Jump to navigation Jump to search
Forwards Revised Pages for GE BWR Std Tech Specs.Updated Tech Specs Should Be Used to Prepare Facility Tech Specs.W/O Encl
ML19274D407
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/10/1979
From: Stolz J
Office of Nuclear Reactor Regulation
To: Jens W
DETROIT EDISON CO.
References
NUDOCS 7901230299
Download: ML19274D407 (2)


Text

._

f UNITED STATES 3

NUCLEA. H EGULATORY COMMisslON g

eg j,j W ASHING TON. D. C. 20555 s?

e g% j e

JAN 101979 Docket No: 50-341 Dr. Wayne H. Jens Assistant Vice President Engineering and Construction The Detroit Edison Company 2000 Second Avenue Detroit, Michigan 48226

Dear Dr. Jens:

SUBJECT:

TECHNICAL SPECIFICATIONS Enclosed is a copy of revised pages for the General Electric BWR Standard Technical Specifications. The enclosed pages supersede the corresponding pages in the copy of GE BWR Standard Technical Specifications that was given to Mr. L. Schuerman last September for use in preparation of Fermi 2 Technical Specifications.

As noted in our September 27, 1978 letter to you, a draft of the Fermi 2 Technical Specifications is scheduled to be transmitted to us by August 26, 1979. The updated GE BWR Standard Technical Specifications should be used in the preparation of the Fermi 2 Technical Specifications. Although we do not expect major revisions to the Standard Technical Specifications during the time Fermi 2 specifications are being prepared, some changes may be necessary.

If such cnanges occur, we will send you replacement pages for incorporation into the Fermi 2 Technical Specifications. A few months prior to the issuance of the operating license, we will restrict changes to the Fermi 2 Technical Specifications (except for the significant ones that would apply to operating boiling water reactors) to allnw adequate time for typing, proofreading, and printing of the final version of the specifications.

If you have any questions regarding the preparation of the Fermi 2 Technical Specifications, please call Robert R. Bottimore on (301) 492-7306.

cerely, o

F. Stolz, Chief ht Water Reactors Branch No. 1 Division of Project Management

Enclosure:

Replacement Pages for GE BWR Standard Technical Specifications cc w/o encl.:

See next page 7901230 297

Dr. Wayne H. Jens cc: Eugune B. Thomas, Jr., Esq.

Mrs. Martha Drake LeBoeuf, Lamb, Leiby & MacRae 230 Fairview 1757 N. Street,ft.W.

Petoskey, Michigan 49770 Washington, D. C.

20036 Peter A. Marquardt, Esq.

Co-Counsel The Detroit Edison Company 2000 Second Avenue Detroit, Michigan 48226 Mr. William J. Fahrner Project Manager - Fermi 2 The Detroit Edison Company 2000 Second Avenue Detroit, Michigan 48226 Larry E. Schuerman Licensing Engineer - Fermi 2 Detroit Edison Company 2000 Second Avenue Detroit Michigan 48226 Charles Bechhoefer, Esq., Chainnan Atomic Safety & Licensing Board Panel V. S. Nuclear Regulatory Commission Washington, D. C.

20555 Dr. David R. Schink Department of Oceanography Texas A & M University College Station, Texas 77840 Mr. Frederick J. Shon Atomic Safety & Licensing Board Panel V. S. Nuclear Regulatory Commission Washington, D. C.

20555 Mr. David Hiller University of Michigan Law School Hutchins Hall Ann Arbor, Michigan 48109 Mr. Jeffrey A. Alson 772 Green Street, Building 4 Ypsilanti, Michigan 48197