ML19274C908

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-369/78-36 on 781030-1103.No Noncompliance Noted
ML19274C908
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 12/01/1978
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19274C906 List:
References
NUDOCS 7901050315
Download: ML19274C908 (2)


See also: IR 05000369/1978036

Text

.

.

.

UNITED STATES

/g" "ECuq(o,

,,

NUCLEAR REGULATORY COMMISSION

,

REGloN li

b

.c (

g

101 M ARIETTA sTRE ET, N.W.

{ ,4~i

ig

'"']

c

!

ATLANTA, GEORGIA 30303

o,

% ...* f

DEC 011978

In Reply Refer To:

RII:WJM

50-369/78-36

Duke Power Company

'

Attn: Mr. William O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

422 South Church Street

Charlotte, North Carolina

28242

Gentlemen:

This refers to the inspection conducted by Mr. W. J. Millsap of this office

on October 30 - November 3, 1978, of activities authorized by NRC Construc-

tion Permit No. CPPR-83 for the McGuire Nuclear Station Unit I facility,

and to the discussion of our findings held with Mr. M. D. McIntosh at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted

of selective examinations of procedures and representative records, inter-

views with personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

One new unresolved item resulted from this inspection and is discussed in

the enclosed report. This item will be examined during subsequent inspec-

tions.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If

this report contains any information that you (or your contractor) believe

to be proprietary, it is necessary that you make a written application

within 20 days to this office to withhold such information from public

disclosure.

Any such application must include a full statement of the

reasons on the basis of which it is claimed that the ir eation is proprie-

tary, and should be prepared so that proprietary information identified in

the application is contained in a separate part of the document. If we do

not hear from you in this regard within the specified period, the report

will be placed in the Public Document Room.

790105 43/S

.

.

DEC 011978

.

Duke Power Company

-2-

Shou 1J you have an; questions concerning this letter, we will be glad to

discuss them with yei-

Sincerely,

Q

h

a

'J. T. Sutherland, Chief

Fuel Facility and Materials

Safety Branch

Enclosure:

Inspection Report No. 50-369/78-36

cc w/ enc 1:

Mr. M. D. McIntosh, Plant Manager

McGuire Nuclear Station

P. O. Box 488

Cornelius, North Carolina

^B031

Mr. J. C. Rogers, Project Manager

McGuire Nuclear Station

P. O. Box 2178

Charlotte, North Carolina

28242

.