ML19273B464

From kanterella
Jump to navigation Jump to search
LER 1-77-115 on 771209:during ECCS Timing Sequence Test, Diesel Generator 3 Failed to Meet 10-s Criteria by 0.1 to 0.2-s.Caused by Air Starting Valve on Left Bank Cylinder Sticking Shut Due to Carbon Buildup
ML19273B464
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/06/1978
From: Banks H
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19273B460 List:
References
LER-1-77-115, NUDOCS 7904060464
Download: ML19273B464 (2)


Text

au acs s LICENSEE EVENT REPORT CONTRO;., BLOCK: l l

l l

l l

l (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6

l N'l C l B l E l P l 1 l@l 0 l 0 l-l 0 l0 l 0 l 0 l0 l-l0 l0 l@ 4] 1l 1l 1l 1l@l l

l@

9 LICENSEE CODE 14 15 LICENSE NUMBER 26 26 LICENst TYPE Jo 67 CAT 68

}

d lol5lo lo 131215 l@l11210 l91717 gj 0 l 1 l 0 l 6 l 7 8l@

60 61 DOCKET NUMBER 68 89 EVENT DATE 74 75 REPORT DATE 80 source EVENT DESCRIPTION AND PROBABLE CON:,EQUENCES h

}lDuring perfortnance of the ECCS Timine Sequence Test (LOGIC), Diesel Generator #3 1

the 10 second criterit l l was starting and loading satisfactorily, but was failing to meet j l by 0.1 to 0.2 seconds.

(Technical Specification 3.5.F)

Jl Jl

)I l

1I so as sue $$t sSCooE

'c5Dt Yo$I sueCiDE couPONENT coot j

i tl rl@ LrJ@ LxJ@ It IN G 11 IN le l@ U@ W @

8 9

to 11 12 13 18 89 20 sE QuE NTI AL OCCUR R E NCE REPORT REvtslON LE R/RO EVENT YEAR REPORT NO.

CODE TYPE

.40

@,at,%

17 17 I L---J l i l 1 1 s_j M

i 01 31 lti t---J O

21 22 23 24 26 27 2.

29 30 31 32 u

AKEN AC ON PLA T M

hours su8 D

FOR 8.

L MAN RER W@[G,j@

W@

W@

l 0 l0 l 010 l W@

y@

l A l@

lX l9 l9 l9 l@

33 34 35 36 17 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTION:,

9tartine valve on one of the left bank evlinders was found to be stuck shut l

ll An sir

]I dua to carbon builduo.

This prevented the evlinder from receivine startine air i

J pressure and caused the diesel to take slichtiv loneer (see attached).

]I 1

Jl i

_] I 30

. 9 sA

%DCWER OTHER STATUS Dis R

OtSCOVERv DESCRIPTION

] [y,,,j @ l110l0lh! NA l

l B l@l ECCS Tertting j

' !ng,Tv caTEm

.T,0 o, REu.sE @

-ou,no,AcTiviTv @ i A

REu AsEo o, REu AsE I

a

] LtJ @ LtJ@l m

PERso~~Et E,os3Es oEseR,PT,o~@

) l0 l 0 l0 h [TvPE @ l

~uM.E R

.g,_j NA

' ' ERso~wl'i,uuks oEsCRi,Tio~@

I uM.ER 1 101010 l@l NA

.o ii n

Loss 0, OR DAMAGE TO FACILITY 904060 % 4 I

TYPE DEsCRIPTeoN 0 L,2J@l m

,o

,o l

llllllI1IIIII5 tssVE RIPTION 0[2_[@DE l

NA

' 'J i

.'A LER C0hTINUATION -- RO#/-77-ll5 Facility: BSEP Unit #1 Even* Date 12-9-77 Cerrective Action:

To Start.

W e valve was soaked in solvent and stroked several times to free it up and dissolve the carbon deposits.

All other air start valves were checked and verified to be operable.

Re preventative maintenance inspection instruction for the diesel generators will be revised to include a section on verification of the operability of the air start valves.

.