ML19273B460

From kanterella
Jump to navigation Jump to search
Forwards LER 1-77-115
Date released: 10/14/2019 Download: ML19273B460


LER 1-77-115 on 771209:during ECCS Timing Sequence Test, Diesel Generator 3 Failed to Meet 10-s Criteria by 0.1 to 0.2-s.Caused by Air Starting Valve on Left Bank Cylinder Sticking Shut Due to Carbon Buildup
ML19273B464
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/06/1978
From: Banks H
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19273B464 (2)
Forwards LER 1-77-115
ML19273B459
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/06/1978
From: Banks H
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19273B459 (1)