ML19273B230

From kanterella
Jump to navigation Jump to search
Forwards IE Circular 79-05, Moisture Leakage in Stranded Wire Conductors
ML19273B230
Person / Time
Site: Calvert Cliffs  
Issue date: 03/20/1979
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
References
NUDOCS 7904050011
Download: ML19273B230 (1)


Text

/ p magg UNITED STATES y*

J' ;

NUCLEAR REGULATORY COMMISSION J. )%

j WASHINGTON, D. C 20555 g

PUBLIC SERVICE ELECTRIC AND GAS COMPANY PHILADELPHIA ELECTRIC COMPANY DELMARVA POWER AND LIGHT COMPANY, ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-272 SALEM NUCLEAR GENERATING STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.15 License No. DPR-70 1.

The Nuciear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Public Service Electric and Gas Company, Philadelphia Electric Company, Celmarva Power and Light Company and Atlantic City Electric Company (the licensee) dated January 12, 1979, and as supplemented January 15, 1979, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set torth in 10 CFR Chapter I; 8.

The facility will operate in conformity with the application, the provisicns of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations:

D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

7904030W,

. 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operatir.g License No. DPR-70 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.15, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment was effective as of January 12, 1979.

FOR THE NUCLEAR REGULATORY COMMISSION tdUbf /

~b'"

/O Schwencer, Chief perating Reactors Branch #1 Division of Operating Reactors

Attachment:

Changes to the Technical Specifications Date of Issuance:

March 6,1979

ATTACHMENT TO LICENSE AMENDMENT N0.15 FACILITY OPERATING LICENSE NO. DPR-70 DOCKET NO. 50-272 Replace the following page sf the Appendix "A" Technical Specifications with the enclosed page.

The revised page is identified by Amendment number and contains vertical lines indicating the area of change.

The corresponding overleaf page 3/4 5-8 is also provided to maintain document completeness.

No changes were made on 3/4 5-8.

Page 3/4 5-7

EMERGENCY CORE COOLING SYSTEMS 3/4.5.4 BORON INJECTION SYSTEM BORON INJECTION TANK LIMITING CONDITION FOR OPERATION 3.5.4.1 The boron injection tank shall be OPERABLE with:

A minimum contained volume of 900 gallons of borated water, a.

b.

Between 20,100 and 21,800 ppm of boron, and A minimum solution temperature of 145 F.

c.

APPLICABILITY: MODES 1, 2 and 3.

ACTION:

With the boron injection tank inoperable, restore the tank to OPERABLE status within i hour or be in HOT STANDBY and borated to a SHUTDOWN MARGIN equivalent to 1% ak/k at 200 F within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; restore the tank to OPERABLE status within the next 7 days or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.*

SURVEILLANCE REQUIREMENTS 4.5.4.1 The boron injection tank shall be demonstrated OPERABLE by:

Verifying the water level through a recirculation flow test a.

at least once per 7 days, Verifying the boron concentration of the water in the tank at b,

least once per 7 days, and Verifying the water temperature a least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

c.

12, 1979 and expiring at 11:55 A.M.,

  • Effective 5:55 P.M. January With l

January 13, 1979 the following ACTION statement is applicable:

the boron injection tank inoperable, restore the tank to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in HOT STANDBY and borated to a SHUTDOWN MARGIN equivalent to 1% ak/k at 200*F within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; restore the tank to OPERABLE status within the next 7 days or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Amendment No, E, 15 SALEM - UNIT 1 3/4 5-7

EMERGENCY CORE COOLING SYSTEMS HEAT TRACING LIMITING CONDITION FOR OPERATION 3.5.4.2 At least two independent channels of heat tracing shall be OPERABLE for the boron injection tank and for the heat traced portions of the associated flow paths.

APPLICABILITY:

MODES 1, 2 and 3.

ACTION:

With only one channel of heat tracing on either the boron injection tank or on the heat traced portion of an associated flow path OPERABLE, operation may continue for up to 30 days provided the tank and flow path temperatures are verified to be > 145'F at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />; otherwise, be in HOT SHUTOOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.5.4.2 Each heat tracing channel for the boron injection tank and associated flow path shall be demonstrated OPERABLE:

a.

At least once per 31 days by energizing each heat tracing channel, and b.

At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying the tank and flow path temperatures to be i 145'F. The tank temperature shall be determined by measurement.

The flow path temperature shall be determined by either measurement or recirculation flow until establishment of equilibrium temperatures within the tank.

SALEM - UNIT 1 3/4 5-8